Categories | Metal Stamping Parts |
---|---|
Place of Origin: | Guangdong, Mainland China |
Brand Name: | LF |
Certification: | ISO9001:2008 |
Model Number: | LF-SQ0806 |
MOQ: | 10 PCS |
Price: | Negotiable |
Packaging Details: | Ply wood Frame Or Customized |
Delivery Time: | MOQ 10 Days, 1000pcs 4 Weeks. |
Payment Terms: | TT, L/C |
Supply Ability: | 3,000pcs Per Month |
Material: | SPCC |
Application: | For Carton Box Folding Machine |
Overall Dimension: | L600*W240*H1250mm |
Board Wall Thickness: | 1.5mm |
Cabinet Net Weight: | 27kgs |
OEM/ODM: | Yes |
Company Info. |
LiFong(HK) Industrial Co.,Limited |
Verified Supplier |
View Contact Details |
Product List |
Powder Coated Stamp and Weld,Solder Stainless Steel Electronic Control Case / Cabinet For Carton Box Folding Machine
Description:
Large Image: Electric Control Cabinet
Electric Control Case
Electric Control Box
Application: For Carton Box Folding Machine
Specification:
Overall Dimension | L600*W240*H1250mm |
Board Wall Thickness | 1.5 mm |
Cabinet Net Weight | 27kgs |
Material:
SPCC (JIS Standard), Cold Rolled Sheet, Cold Rolled Strips.
Board Regular Dimension: L2440*W1250*Thickness 0.5-3mm.
Hardness: SPCC-1, SPCC-2, SPCC-4, SPCC-8, SPCC-S
HRB & HV 1/8 Stereoplasm 8 50~71 95~130 1/4 Stereoplasm 4 65~80 115~150 1/2 Rigidity 2 74~89 135~185 Stereoplasm 1 ≥85 ≥170 Annealing S 85~110 Chemical Composition C Si Mn P S ≤0.10 ≤0.05 ≤0.50 ≤0.035 ≤0.025
Surface Powder Coating, With Salt Spray Test Over 96 Hours.
Processing Technic:
1. Cutting
2. Laser Cutting Or Computer Stamping to Forming
3. Bending
4. 2nd Machining, Make Screw Holes If Possible.
5. Assembly: Screwing Tight or Rivet Mount Tight; Argon Arc Welding.
6. Polishing to Remove Shape Edges
7. Powder Coating
8. Quality Check
9. Packing
Facility:
Laser Cutting Machine
Bending Machine
Brush Finish Room
Advantages:
1.Professional Research and Design Team, Necessary Equipments: Automatic Cutting Machine, Laser Cutting Machine, Automatic Press, Cold Press, Bending Machine
2.Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5.Comprehensive After-Sale Service, Quick Responses For Daily Communication