Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Engine Parts >

Hydraulic Submersible Centrifugal Pump For Waste Water Drainage 2650 m³/h Capacity

Categories Submersible Sewage Pump
Brand Name: GSD
Model Number: CP
Certification: CE,ISO,SPAN,ECA
Place of Origin: CHINA
MOQ: Negotiation
Price: Negotiation
Payment Terms: T/T
Supply Ability: 1000 Sets per Month
Delivery Time: 15 days
Packaging Details: plywood case
Capacity: 6-2650m³/h
Structure: Single stage
Model: CP
Fuel: motor drive
Usage: Submersible
Head: 6-45m
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Hydraulic Submersible Centrifugal Pump For Waste Water Drainage 2650 m³/h Capacity

    Hydraulic Submersible Centrifugal Pump For Waste Water Drainage 2650 m³/h Capacity​



    Points for attention before starting equipment:

    1. Don't connect the electric wire of the water pump with the power source without any protective device (which may lead to the burning of the motor due to open-phase and overload). Refer to the connection method of the submersible pump. (refer to Page 9 for details).

    2. Before installation, check the rotation direction of the motor, the correction rotation direction is that the motor rotates counter-close seen from the suction direction of the impeller. If the rotation direction is not right, the connection positions of any two phases in three phases shall be shifted to get it rotate in a correct direction.

    3. Check whether the operation of the level controller is in normal so as not to affect the service life of the submersible motor.

    4. Close the gate valve of the outlet pipeline and start the motor. Under the circumstance that the gate valve of the outlet pipeline is shut, the pump cannot rotate over 3 minutes continuously. Monitor the motor current by switching on the gate valve and control the current within the rated range, and check whether the pressure of the pressure gauge and the operation of the pump are in normality, and refer to the trouble shooting sheet to remove in case of abnormality.

    5. Operation without water is prohibited.

    Read this Installation, Operation and Maintenance Manual carefully to guarantee the safe operation of the equipment.

    The safety notice in the manual includes warning and points for attention:

    Points for attention mean possible dangers, which may cause slight or moderate injuries of humans or equipments if not removed.


    Warning:The water pump shall not be moved without putting off the power source. Humans shall not contact the water source where the pump is located when pumping water to prevent electric shock accidents in case there is no current leakage protective device while there is current leakage with the pump.


    Application:

    1Cabin ponding .
    2Waste water drainage.
    3The based of building drainage equipment and sewer drainage works.


    Features:

    1The power lower than 15KW is optional,not lower than 15KW is standard accessories.
    2overload & overheating to Built-in heat protector in bearing, when the bearing is abnormal and the temperature rises to disconneting temperature,
    3the protector automatically cat off power supply to protect the bearing.(options)
    4Pumps make use of inner pressure of pump cauvty to make liquid contiwue entering to space between cooling house and motor outer, to take away the heat the motor produces.
    5The power not lower than 18.5KW is optional



    Construction:

    No.NameMaterial
    GBJIS
    1Neck bolt2Cr13SUS420
    2Heat-Protector--
    3Motor coverHT200FC200
    4-1Bearing--
    4-2Bearing--
    5Cooling house flangeQ215ALSS330
    6Shaft2Cr13SUS420
    7Rotor--
    8Stator--
    9Cooling house0Cr18Ni9SUS304
    10Bearing coverHT200FC200
    11Motor casingHT200FC200
    12BracketHT200FC200
    13Leakage detector--
    14-1Mechanical sealC-Al2O3C-Al2O3
    14-2Mechanical sealSiC-SiCSiC-SiC
    15Oil boxHT200FC200
    16Oil coverHT200FC200
    17Washer0Cr18Ni9SUS304
    18Impeller nutHT200FC200
    19Seal-ringLBC2LBC2
    20StrainerHT200FC200
    21ImpellerHT200FC200
    22Pump casingHT200FC200
    23Bottom coverHT200FC200
    24Pall pipingQ215ASS330/SS34
    25Flange setterHT200FC200
    26SlideHT200FC200
    27DuckfootHT200FC200
    28DischargeQ215ASS330/SS34

    Installation base of pumps:
    1. The base shall be of enough strength, stability and durability.
    2. The subsidence and the inclination shall be within the allowable range under the static strength to ensure the normal operation of the water pump.
    3. The clear distance between the detachable flange to the side face of the base is not less than 100mmm generally. The thickness of the leveling blanket or the grout blanket of second placement is not less than 25mm.
    4. The form, sizes and installation position of the foundation bolt shall be adopted in accordance with the installation drawing. Its minimal depth buried in the concrete shall be determined with the actual stress.
    5. The weight of the designed base and the embedded depth of the base shall be determined in accordance with the requirements of the installed objects, with the principle that the disturbing force will not shake the base when the pump is in operation. The weight of the water pump generally shall be over 10 times that of the water pump.

    Buy Hydraulic Submersible Centrifugal Pump For Waste Water Drainage 2650 m³/h Capacity at wholesale prices
    Send your message to this supplier
     
    From:
    Enter your email please.
    To: GSD Industrial Co., Ltd.
    Subject:
    Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0