Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Steel >

Self Climbing Formwork System Versatile Backets For High Rise Buildings

Categories Climbing Formwork System
Brand Name: HORIZON
Model Number: Climbing scaffold
Place of Origin: CHINA
MOQ: 60 sets
Price: pls ask HORIZON
Payment Terms: L/C, T/T
Supply Ability: 100 tons per week
Delivery Time: 20-25 days
Packaging Details: pallets, bundles, bulk
Material: steel square tube, climbing bracket, panel strut
OEM: Available
Colour: as per request
Working platform: 2.4m
Climbing style: By crane lifting
Application: for high-rise buildings
Finishing platform: available
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
  • Submit Buying Request
    • Product Details
    • Company Profile

    Self Climbing Formwork System Versatile Backets For High Rise Buildings

    Versatile Backets for All Types of Climbing Applications in High-rise Buildings


    Climbing Formwork CB240 is a crane-dependent climbing system and support structure widely used to pour high walls. It performs as a loading-bearing platform as well as a safe working platform. Depending on the length of the platform, the Climbing System is applicable to heights of more than 100 m over ground and allows a maximum formwork height of up to 5.40 m.

    • The sets made up of brackets and formwork panels are moved to the next pouring step with one single crane lift.

    • Adaptable to any structures, including straight, inclined and circular walls.

    • It is possible to build working platforms at different levels. The access to the platforms is provided by safety ladders.

    • All brackets include all the connectors to fix handrails, push-pull props and other accessories.

    • The climbing brackets allow rolling-back the formwork panels using a system, formed by a carriage and a rack, incorporated in these brackets.

    • Formwork’s vertical adjusting and plumbing is completed with leveling screw jacks and push-pull props.

    • Brackets are anchored to the wall with anchor cone system.


    1. Climbing bracket


    2. Main platform


    3. Pouring platform


    4. Finishing platform


    5. Roll-back system


    6. Push-pull prop


    7. Vertical waling


    8. Anchor system


    9. Formwork

    Climbing sequence:


    Step 1

    The first pouring is to be completed by using the proper wall elements and has to be exactly aligned with adjusting struts.


    Step 2

    The completely pre-assembled climbing scaffold units consisting of climbing brackets with plank bottom and bracing have to be attached to the bracket anchoring and secured.

    Then the formwork and the move-off carriage together with the aligning beam has to be positioned on the brackets and fixed.


    Step 3

    After shifting the climbing scaffold unit to the next pouring position the finishing platform is to be mounted to the brackets to complete the climbing system.


    Step 4

    Release and remove bolts that fixing the positioning anchor point.

    Loosen and remove tie-rod

    Loosen the wedges of the carriage unit.


    Step 5

    Retract the carriage and lock it with wedge.

    Install upper climbing cones

    Loosen wind securing device, if any

    Remove the lower climbing cone


    Step 6

    Adjust the carriage into the common center of gravity and lock it again.

    Attach the crane sling to the vertical waling.

    Remove the security bolts of the bracket.

    Lift the climbing bracket by crane and attach it to the next prepared climbing cone.

    Insert and lock the security bolts again.

    Install the wind-load device, if required.


    Step 7

    Move the carriage back and lock it by wedge.

    Clean the formwork.

    Install reinforcement bars.



    Step 8

    Move the formwork forward until lower end rests against top of the finished section of the wall.

    Adjust formwork vertically by means of push-pull brace.

    Fix tie-rods for the wall formwork


    Buy Self Climbing Formwork System Versatile Backets For High Rise Buildings at wholesale prices
    Send your message to this supplier
     
    *From:
    *To: HORIZON FORMWORK CO., LTD.
    *Subject:
    *Message:
    Characters Remaining: (0/3000)
     
    Inquiry Cart 0