Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Shenyang Zhengchuang Construction Machinery Co., Ltd
ICP Remarked Supplier
Home >

Tower Crane Topless 8Ton Tower Crane Flat Top

Tower Crane Topless 8Ton Tower Crane Flat Top

Country/Region china
Company Shenyang Zhengchuang Construction Machinery Co., Ltd
Categories Flat Top Tower Crane
Update 2019-08-10 05:31:18
ICP License Issued by the Chinese Ministry
Contact Now

Topless 8Ton Tower Crane Flat Top

Topless 8Ton Tower Crane Flat Top Manufacturers, Topless 8Ton Tower Crane Flat Top Factory, Supply Topless 8Ton Tower Crane Flat Top
Topless 8Ton Tower Crane Flat Top
  • Brand ZCJJ
  • Product origin China
  • Delivery time Stock
  • Supply capacity 15 units

The flat-head tower crane arm section special connection way and does not have the tower head, the pull rod, makes its hoisting arm section by section disassembly very simple.

Email
AddThis Sharing Buttons
Share to FacebookFacebookShare to TwitterTwitterShare to EmailShare to PinterestPinterestShare to LinkedInLinkedInShare to WhatsAppWhatsAppShare to ...AddThis

Description Specification

Topless 8Ton Tower Crane , Flat Top 8Ton Tower Crane

Model:TCT6016 ,8Ton

Jib length: 60m

Max load: 8Ton

Tip load: 1.6Ton

Mast type: 2m , L68A1 Mast Section , AND 1.6m , L46A1 Mast Section

Type, Stationary , Inter Climbing , Travelling.

Topless 8Ton Tower Crane Flat Top

Tower Crane Knowledge sharing:

This paper briefly introduces the installation preparation, installation steps and operation points of tower crane

(1) preparation

Check whether the subgrade and track laying meet the requirements, bury the ground anchor, and determine the location of the ground anchor according to the lifting direction and the total height of the tower.

Topless 8Ton Tower Crane ,

(2) overall installation

Install the walking mechanism, door frame and weight according to the procedure specified in the manual. The lifting boom is inserted on the support shaft of the platform of the door frame, and the tower body and tower cap are assembled on the battlements according to the horizontal assembly dimensions of the tower body, so that the tower body is on the battlements, and its axis is roughly parallel to the ground.

(3) wear wire rope

The hoist wire rope is fixed on the crane head through the pulley block from the cab to the tower cap. The total length of the rope and the distance between the two pulley blocks shall be determined by calculation.

Flat Top 8Ton Tower Crane

(4) before erecting the tower

The controller, limit switch and other electrical equipment should be checked. The mobile control panel in the control room should be removed and mounted on the outdoor bracket for easy operation when the tower is erected.

(5) erect the tower

After inspection, confirm that the situation is normal, continue to operate the winch, so that the tower is stable erect, auxiliary ground anchor wire rope loose.

Flat Top 8Ton Tower Crane

Related Links:

Tower Crane

luffing jib tower crane

Related Products

Product Tags:

tower crane

      

mast section

      

flat top tower crane

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Tower Crane Topless 8Ton Tower Crane Flat Top Images

Inquiry Cart 0
Send your message to this supplier
 
From:
To: Shenyang Zhengchuang Construction Machinery Co., Ltd
Subject:
Message:
Characters Remaining: (0/3000)