Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Shenyang Zhengchuang Construction Machinery Co., Ltd
ICP Remarked Supplier
Home >

Tower Crane Topkit 6Ton Tower Crane Hammer Head

Tower Crane Topkit 6Ton Tower Crane Hammer Head

Country/Region china
Company Shenyang Zhengchuang Construction Machinery Co., Ltd
Categories Tower Cranes
Update 2019-08-10 05:31:36
ICP License Issued by the Chinese Ministry
Contact Now

Topkit 6Ton Tower Crane Hammer Head

Topkit 6Ton Tower Crane Hammer Head Manufacturers, Topkit 6Ton Tower Crane Hammer Head Factory, Supply Topkit 6Ton Tower Crane Hammer Head
Topkit 6Ton Tower Crane Hammer Head
  • Brand ZCJJ
  • Product origin China
  • Delivery time 20 days
  • Supply capacity 10units

Topkit tower crane is generally used in the construction site or the bridge site, through the big arm slewing and the trolley far and near to control the position of the hook, can lift the object in the turning radius. Compared with tower crane with tower head and tie rod, the model of hoisting arm force is simple and clear. Because there is no tower head, the installation height is low, which makes the installation faster and safer. Suitable for large buildings

Email
AddThis Sharing Buttons
Share to FacebookFacebookShare to TwitterTwitterShare to EmailShare to PinterestPinterestShare to LinkedInLinkedInShare to WhatsAppWhatsAppShare to ...AddThis

Description Specification

6Ton Hammer Head Topkit Tower Crane ,

Model: TC5013 ,

Jib length: 50m

Max load: 6Ton

Tip load: 1.3Ton

Mast type: 1.6m , L46A1 Mast Section, or QTZ mast1.5*1.5*2.5m

Type, Stationary , Inter Climbing , Travelling.

Topkit 6Ton Tower Crane

Tower Crane Knowledge sharing:

This paper mainly introduces the safe operation rules of the lower tower crane: machinery, personnel, environment, operation and other requirements

(1) tower crane foundation soil bearing capacity must be used strictly in accordance with the original factory rules or meet.

(2) the track foundation or concrete foundation of tower crane must be checked and calculated through design, and can only be used after passing the acceptance inspection. Slope and drainage facilities shall be built around the foundation, and a certain safety distance shall be kept from the foundation pit.

(3) the demolition and installation of tower cranes must be carried out by a professional team that has obtained the qualification certificate for the demolition and installation issued by the construction administrative department.

(4) disassembling and assembling personnel shall wear safety protection articles, fasten safety belt when working in height, and be familiar with and earnestly implement disassembling and assembling process and operating procedures.

(5) after the installation of the tower crane, technical inspection and adjustment of the whole machine shall be carried out. Only after passing the inspection in stages and the whole machine, can the crane be delivered for use. In the case of no load, the vertical deviation between the tower and the ground shall not exceed 4/1000. The motor and hydraulic device of the tower crane shall be in accordance with the relevant provisions on the motor and hydraulic device.

Topkit 6Ton Tower Crane

(6) jacking, installation and disassembly shall not be carried out when the wind force reaches grade 4 or above. Before jacking, check the connection of each part of hydraulic jacking system. Do not turn the boom or other work when jacking.

(7) in case of gale-force 6 or above, heavy rain, snow, fog and other bad weather, the tower crane shall stop working in the open air. After the rain and snow or rain and snow in the o


Product Tags:

tower crane

      

tower cranes

      

hammer head tower crane

      
China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Tower Crane Topkit 6Ton Tower Crane Hammer Head Images

Inquiry Cart 0
Send your message to this supplier
 
From:
To: Shenyang Zhengchuang Construction Machinery Co., Ltd
Subject:
Message:
Characters Remaining: (0/3000)