| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Aluminium Die Castings |
|---|---|
| Place of Origin: | Guangdong, Mainland China |
| Brand Name: | LF |
| Certification: | ISO9001:2008, TS16949 |
| Model Number: | LF-DJ1016 |
| MOQ: | 1000 PCS |
| Price: | Negotiable |
| Packaging Details: | Part in Bubble Bag, then in Cartons, Wooden Pallet on Bottom, Film wrapped overall then Nylon belt fastened Or to be Customized Means of Packing. |
| Delivery Time: | MOQ 2 Weeks, 10,000pcs+ : 4 Weeks. |
| Payment Terms: | TT, L/C, L/C, D/A, Western Union, MoneyGram |
| Supply Ability: | 30,000 PCS Per Month |
| Material: | ADC12, A380 |
| Processing: | Die casting |
| Application: | LED Fixture |
| Color: | Silver |
| Weight: | 1.2KG |
| Place Original: | Dongguan, China |
| Company Info. |
| LiFong(HK) Industrial Co.,Limited |
| Verified Supplier |
| View Contact Details |
| Product List |
Aluminium Die Casting Parts Machined parts High Disspation For LED Lighting Base
Quick Details:
Precision Aluminum die casting & Aluminum casting
Large Image: Transmission Housing For Golf Cart, Club Car and Caddy
Surface Treatment: Sand Blasting
Depend on customer's requirements
Description:
Large Image: Transmission Housing for Golf Cart,
Transmission Housing for Club Car,
Transmission Housing for Caddy
Application:
LED Fixtures, Led lighting
Specification:
| Overall Dimension | L400*W250*H150mm |
| Surface Treatment | Die casting |
| Part Weight | 3.0kgs |
| Material | ADC12(Standard: JIS H 5302-2000) |
Facility:

Die Casting Workshop

Die Casting Workshop
Processing Technic:
1. Die Casting Tooling Making--Prototype/T1--Dimension Check-- Sample Approval-- SOP
2. Die Casting-- Remove Water Gap--Deburring-- Machining--Dilling Holes/ Threading-- Quality Check (dimension and STEAM TIGHT TEST)-- Sanding Blasting --QC (Surface Vision Checking)-- Packing
Advantages:
1. Professional Research and Design Team (20 Persons), Possess All Necessary Equipments.
2. Strict Quality Control in Each Process and Finish Product Quality Control
3. Short Delivery Lead Time: 15-30 Days
4. Optional For OEM or ODM
5. Comprehensive After-Sale Service, Quick Responses For Daily Communication
|