| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Roll Forming Equipment |
|---|---|
| Brand Name: | SUSSMAN |
| Model Number: | SS-FD |
| Certification: | CE |
| Place of Origin: | CHINA |
| MOQ: | 1 set |
| Price: | negotiable |
| Payment Terms: | T/T, L/C |
| Supply Ability: | 10 sets per month |
| Delivery Time: | 65 working days after deposit |
| Packaging Details: | Standard package with film, plastic and steel wire. (or customized) |
| Rolling speed: | About 10m/min |
| Power supply: | 380V, 50HZ, 3 phase |
| Motor cutting power: | 7.5 KW |
| Roller stations: | Normally 16 stations |
| Control system: | PLC with touch screen |
| Material: | Galvanized steel sheet |
| Company Info. |
| Sussman Machinery(Wuxi) Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Fire Damper Roll Forming Machine
Technical Parameter
| Material of coil | Material Thickness | 1.0--1.5mm |
| Un Coiler | 5 tons manual | |
| Forming system | Rolling Speed | About 10m/min |
| Roller Stations | About 16 stations | |
| Roller Material | Gcr15 coated with chrome | |
| Shaft diameter | 65mm | |
| Maim Motor Power | 11kw | |
| Pinching motor | 2.2kw | |
| Motor cutting Power | 7.5kw | |
| Cutting system | Material Of Cutting | CR12mov with quench treatment |
| Hardness | HRC58-62 | |
| Tolerance | +-1.5mm | |
| Cutting blades | 3 sets | |
| Electrical control system | Electric Source | 380V, 50HZ,3 phase Also can satisfy Customer’s requirey |
| Control System | PLC (Panasonic) as list in the note | |
| Weight | About 8 tons | |
| Way Of Drive | 1.2 inch chain |
Fire Damper Main Components
Working Flow of Fire Damper
De-coiler—→Level device —→Main roll forming machine—→Hydraulic cutting—→ Run out table

Profile of product


Loading picture

After-sale Serive
- The seller take responsibility to installation and commissioning
of the equipment and free training. After machine arrive the
destination, by the request of the buyer , the seller will provide
1 technical engineer to guide installation and training , and the
buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)
|