| Sign In | Join Free | My benadorassociates.com | 
 | 
| Categories | Sponge Production Line | 
|---|---|
| Brand Name: | ZHMACH | 
| Model Number: | ZHF-2017-7 | 
| Certification: | CE Certificate | 
| Place of Origin: | Guangdong China (Mainland) | 
| MOQ: | one set | 
| Price: | inquiry | 
| Payment Terms: | Western Union, T/T, L/C | 
| Supply Ability: | two sets per month | 
| Delivery Time: | 45 days | 
| Packaging Details: | Paper and Film, Wooden case The whole set of one standard 13groups need 1*20GP and 2*40HQ. | 
| Weight: | 20 tons | 
| Dimension(L*W*H): | L5430xW4650xH2590mm | 
| After-sales Service Provided: | Engineers available to service machinery overseas | 
| Power(W): | 43kw | 
| Foaming Model: | Semi-automatic | 
| formular: | auto save the formulations | 
| Warranty: | one year | 
| Inverter: | Siemens/ Delta /Danfoss | 
| Chemical: | PPG, TDI, MC, Silicone+H2O, T9, A33, Etc. | 
| Pumps: | US. Viking/ Chinese/ Japanese | 
| Company Info. | 
| Dongguan Zehui machinery equipment co., ltd | 
| Verified Supplier | 
| View Contact Details | 
| Product List | 
Semi-Auto Polyurethane Sponge Production Line For Foaming Mattress and Furniture
Company Information
Zehui Foaming Machinery Technology Co.,Ltd is the foam machine factory established in 2008 manufacture the automatic continuous foaming machine line and some relevant foam cutting machines.
Our main products ZHF-2017 Foam Production Line can make the foam for furniture industrial shoes industrial and so on.
ZHF-2017-7 Semi-Auto Foam Making Machine
Main technique specification:
1, Dimension:L2.8 m×W1.5m×H2.5m
2, Foam mould size(can be adjusted): W1500-2000×L2000-3000×H1200 two sets
3, Foaming material Group: 7 groups, man-machine interface control
4, Foaming height: Max 1200mm
5, Foaming density: 8Kg/m³~100kg/m³
6, Foaming speed: 2000r/min~7000r/min
7, Max total output:230L/time
8, Mixing –head motor: 11kw
9, Total power: About 43 kw
Main collocates and material chooses:
Material pot types: (The work pressure in the pot is normal pressure)
| Type | Use | Specification | Qty | 
| Big material tank | PPG+mixture material | 3m³/δ5mmA3 steel plate, with temperature controlling, stirrer, filter system | 1 | 
| Big material tank | TDI | 2m³/δ5mm A3 steel plate, with temperature controlling, stirrer, filter system | 1 | 
| Big material tank | MC | 1m³/δ2mm stainless steel | 1 | 
| Small material tank | Si,T9,A33,Color | 80L/δ1mm stainless steel | 4 | 
Transducer Types
| Model | Power/kw | Use | Qty | Brand | 
| VFD-B | 11 | Mixing head | 1 | Delta | 
| VFD-B | 5.5 | PPG | 1 | Delta | 
| VFD-B | 3.7 | TDI | 1 | Delta | 
| VFD-B | 2.2 | MC | 1 | Delta | 
| VFD-B | 1.5 | Si,T9,A33,Color | 4 | Delta | 
Motor types:
| Model | Power/kw | Use | Qty | Brand | 
| Y200L-2 | 11 | Mixing head | 1 | Guangdong | 
| Y132S-4 Horizontal | 7.5 | PPG | 1 | Guangdong | 
| Y132S-4 Horizontal | 3.7 | TDI | 1 | Guangdong | 
| Y100-4 Horizontal | 2.2 | MC | 1 | Guangdong | 
| Y100-6 Horizontal | 1.5 | Ann, Si, Tin, Color, | 4 | Guangdong | 
| Y100-4 Vertical | 2.2 | PPG material mixing | 1 | Guangdong | 
| Y100-4 Vertical | 1.5 | TDI Mixing | 1 | Guangdong | 
| Y100-4 Horizontal | 2.2 | PPG mixing | 1 | Guangdong | 
| Y100-4 Horizontal | 2.2 | TDI filing | 1 | Guangdong | 
Our Services
We will help to design the layout of the machine that put in your factory.
We will send 2-4 experience engineers to install and testing the machines.
We will teach your engineer how to operate the machine and how to maintain the machines.
We will give you the machine operation manual and the best formulation for target products that you are going to make.
FAQ
Q: How many days for the install and testing of the machine?
A: After all the machine in your factory we will send 1-2 engineer help to install the machine you must send someone to help about 30 days installation will finished. After that one electrician and one foaming engineer will come to connecting the cable and run the machine in 15days. Total 45days the machine can be running.
Q: For the cost of the engineer how much I need to pay?
A: You need to pay USD50 one day for one engineer and also need to pay for the visa fee turn-round ticket fee and food hotel.
Q:What kind of raw material tools we need to prepare for the testing?
A: We will send you a list for the tools that you need to prepare for testing and also can help to buy if you required.
Q: After the machine testing if we need some engineer to stay in our factory can you help to find?
A: Sure we can help to hire one experience engineer to work in your factory but you need to discuss the salary and all details with him.
Q:During the foaming if we have some problems abt the foam and the machine how can we do?
A: You can just call our after sale manager explain for the situation or send some picture we will help to handle within 24hours.

|   | 
 Continuously Sponge Production Line , Automatic Foam Mattress Making Machine
                                                                                        
                                                        
                        
                        
                        
                                                            Continuously Sponge Production Line , Automatic Foam Mattress Making Machine
                                                    
                        
                     Automatic Continuous Foam Making Machine , EPE Foam Sheet Extrusion Line
                                                                                        
                                                        
                        
                        
                        
                                                            Automatic Continuous Foam Making Machine , EPE Foam Sheet Extrusion Line
                                                    
                        
                     43kw Semi-Automatic Sponge Production Line For Foaming Mattress And Furniture
                                                                                        
                                                        
                        
                        
                        
                                                            43kw Semi-Automatic Sponge Production Line For Foaming Mattress And Furniture
                                                    
                        
                     Mattress Sponge Making Machine With Electronic Braking , Polyurethane Foam Blocks Manufacturers
                                                                                    
                        
                        
                        
                                                            Mattress Sponge Making Machine With Electronic Braking , Polyurethane Foam Blocks Manufacturers
                                                    
                        
                     Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress
                                                                                        
                                                        
                        
                        
                        
                                                            Polystyrene Flexible Sponge Production Line / Continuous Foaming Machine For Mattress
                                                    
                        
                     Full Automatic Sponge Production Line , PU Foam Manufacturing Machines 200~300L/min
                                                                                        
                                                        
                        
                        
                        
                                                            Full Automatic Sponge Production Line , PU Foam Manufacturing Machines 200~300L/min
                                                    
                        
                     Vertical Foam Mattress Making Machine Manual Operation With Speed 30~40 R/Min
                                                                                        
                                                        
                        
                        
                        
                                                            Vertical Foam Mattress Making Machine Manual Operation With Speed 30~40 R/Min
                                                    
                        
                     Continuous High Pressure Sponge Production Line For Mattress / Pillow Automatic 380V
                                                                                        
                                                        
                        
                        
                        
                                                            Continuous High Pressure Sponge Production Line For Mattress / Pillow Automatic 380V
                                                    
                        
                     Packaging Net / Net Bath Sponge Production Line , Continuous Sponge Foaming Making Machine
                                                                                        
                                                        
                        
                        
                        
                                                            Packaging Net / Net Bath Sponge Production Line , Continuous Sponge Foaming Making Machine
                                                    
                        
                     Large Output Max Foam / Continuous Sponge Production Line With Siemens Tranducer
                                                                                    
                        
                        
                        
                                                            Large Output Max Foam / Continuous Sponge Production Line With Siemens Tranducer