| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Cold Roll Forming Machine |
|---|---|
| Brand Name: | Shenghong |
| Model Number: | SH16-06-05-05 |
| Certification: | ISO9001 and CE |
| Place of Origin: | China, Jiangsu |
| MOQ: | 1 sets |
| Price: | Negotiation |
| Payment Terms: | T/T |
| Supply Ability: | 30 SETS/ MONTH |
| Delivery Time: | 40 days after payment |
| Packaging Details: | Container |
| Material of rollers: | 45# steel |
| Production Capacity: | 8-10m/min |
| Power(W): | 5.5 kw |
| Step of rollers: | 13 |
| Thickness: | 0.5-1.5mm |
Drawing for you reference:
| Material specification | Aluminum, galvalume, galvanized and pre-painted galvanized steel. |
| Thickness | 0.3 mm to 0.7mm. |
| Main motor power | 4 kw. |
| Hydraulic station power | 3 kw. |
| Feeding width | Depends on the model of profile. |
| Yield stress | 235Mpa(33KSI) ~ 345Mpa (50KSI). |
| Roll forming Speed | 12 m/minute. |
| Cutting Tolerance | +/-2.5mm(length≤5000mm); +/-3.0mm(5000mm<length≤10000mm). |
| Manual Uncoiler | Max. Capacity: 3000kgs. |
| Coil inner diameter | 508mm. |
| Voltage | As per customer’s request. |
| Numbers of stands | 12 stands/stations/pairs for each roll forming system. |
| Type of cutting | Roll-formed and length-set profile cutting. |
| Roller Material | High grade No.45 forged steel, coated with hard chrome. |
| Active Shaft Material | High grade No.45 carbon wrought steel, which can improve the integrated mechanic feature of the shaft. |
| Electric Elements | PLC control panel, transducer imported from Mitsubishi of Japan. Other elements are from famous suppliers of China. |
| Cutter blades | Cr12 mould steel with quenched treatment. |
Uncoiling the sheet --- Infeed guiding --- Roll forming --- Rectifying the straightness ---
--- Measure length --- Cutting the panel --- panels to the supporter (option: automatic stacker).
The seller take responsibility to installation and commissioning of
the equipment and free training. After machine arrive the
destination, by the request of the buyer , the seller will provide
1 technical engineer to guide installation and training , and the
buyer should give the technical person with full cooperated.
Installation period: about 5 days after the complete preparation by
the buyer such as the foundation and all necessary accessories.
Training time: 5 days.
Before departure of the engineers from seller, the buyer should pay
for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)
|