| Sign In | Join Free | My benadorassociates.com |
|
| Categories | filling sealing machine |
|---|---|
| Place of Origin: | China |
| Brand Name: | MG |
| Certification: | CE |
| MOQ: | 1 set |
| Price: | 10000USD/set |
| Packaging Details: | Wooden Cases |
| Delivery Time: | 30 days |
| Payment Terms: | T/T |
| Company Info. |
| Taizhou Macgo Machinery Co.Ltd |
| View Contact Details |
| Product List |
Reference:
| Items | Content |
| Packing speed | Max 30 bag/min |
| Bag size | Front width:100-180mm Side width:50-90mm Width of side seal:5-10mm Length:100-350mm |
| Bag making mode | Block bottom type |
| The maximum width of packing film | 520mm |
| Air consumption | 0.8Mpa0.36M3/min |
| Main power/voltage | 43.5KW/220V 50HZ |
| Dimension | (L)1600×(W)1400×(H)2000mm |
| The weight of switchboard | 750kg |
The main components and brand of this machine as following:
| Number | Name | Brand | Country/Region |
| 1 | Touch sensitive screen | WEINVIEW | TAIWAN |
| 2 | PLC | MITISUBISHI | JAPAN |
| 3 | Servo motor | SIEMENS | GERMANY |
| 5 | Vertical cylinder | SMC | JAPAN |
| 6 | Cutting cylinder | SMC | JAPAN |
| 7 | Two units system | SNS | TAIWAN |
| 4 | Horizontal cylinder | SMC | JAPAN |
| 8 | Solid state relay | FOTEK | TAIWAN |
| 9 | Intermediate state relay | OMRON | JAPAN |
| 10 | Photoelectric eye | AUTONICS | KOREA |
| 11 | Power | MW | TAIWAN |
| 12 | winding motor | TAIBANG | TAIWAN |
| 13 | Thermometer control | OMRON/YATAI | JAPAN/SHANGHAI |
Other Information:
1. Operation Manual: In English
2. Installation team: Commissioning service provided, at buyer's
account. We shall send about 1-2 technicians the installation and
testing work takes about 3-10days.
3. Training: Training to the local operator to be carried out by
the supplier at the time of installation/ commissioning/ trial run
at factory.
4. Warranty: One year from the date of completion of the
commissioning (except man-made damage, and the wearing parts, for
example the drawing belt)
5.Pre-shipment Inspection:
A). Supplier should trial run whole line at supplier's factory
before shipment;
B). Supplier has to run the machine at least 1hour for each bag
former
C). All raw materials for that trial run to be arranged by supplier
at their cost.
|