| Sign In | Join Free | My benadorassociates.com |
|
| Categories | DOM Steel Tube |
|---|---|
| Brand Name: | TORICH |
| Model Number: | BS 6323-4 CFS 3/ CFS 3A/ CFS 4 |
| Certification: | ISO9001, ISO14001, TS16949 |
| Place of Origin: | ZHEJIANG, CHINA |
| MOQ: | 5Tons |
| Price: | USD1200-1300 |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 2000Tons per Year |
| Delivery Time: | 30-45 work days |
| Packaging Details: | DOM Seel Tubes are packed in wooden boxes or hexagonal bundles in seaworthy packing. |
| Keyword: | DOM Steel Tubes |
| Standard: | BS 6323 |
| Material: | CFS 3, CFS 3A, CFS 4 etc |
| Surface: | Customers't Requirement |
| Shape: | Round |
| Heat Treatment: | NBK |
| OD: | 5-220 mm |
| WT: | 0.5 - 25 mm |
| Length: | Max 7000mm |
| Usage: | Auto Industry |
| Company Info. |
| TORICH INTERNATIONAL LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |
Product Description:
OD: 5-220 mm
WT: 0.5-25mm
Length: Max 7000mm
Delivery Condition:
1 BK Cold finished(hard)
2 BKW Cold finished(soft)
3 GBK Annealed
4 NBK Normalized
5 GZF Annealed (including de-scaling)
6 NZF Normalized (including de-scaling)
DOM Steel Tube Production Process:
Raw material → Incoming inspection → Cutting → Heating → Piercing → Hammering →Pickling → Cold-drawing → Heat treatment → Physical chemistry test → Straightening → Ends cutting → Final inspection → Bundling →Storage
1. Incoming Raw Material Inspection
2. Raw Material Segregation to avoid steel grade mix-up
3. Heating and Hammering End for Cold Drawing
4. Cold Drawing and Cold Rolling, on line inspection
5. Heat Treatment, +A, +SRA, +LC, +N, Q+T
6. Straightening-Cutting to specified length-Finished Measuring
Inspection
7. Machanical Testing in own labs with Tensile Strength, Yield
Strength, Elongation, Hardness, Impact, Mictrostruture etc
8. Packing and Stocking
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a
perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate
longitudinal and transversal defects.
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
|