| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Electric Air Source Heat Pump |
|---|---|
| Brand Name: | Meeting |
| Model Number: | MD30D |
| Certification: | CE ISO CCC UKAS,ROHS |
| Place of Origin: | Guangzhou China |
| MOQ: | 5 PCS |
| Price: | Negotiation |
| Payment Terms: | T/T, L/C WESTERN UNION |
| Supply Ability: | 800/MONTH |
| Delivery Time: | 15 days |
| Packaging Details: | Plywooden case |
| Materail: | Galvanized steel sheet |
| Contactor: | Fuji Brand |
| Copper Pipe thick: | 1 mm |
| Compressor: | ZW Series ,With Crank heating |
| Working Temperature: | -20--45 degree |
| Insulation: | Foam pack Pipe and Stick on the machine innner |
| Defrosting: | Automaticlly |
| Temperature: | 80 degree |
| Installation: | Freestanding |
Technology Specification
Quick Details
QC:
1. Complying with ISO standard. Quality Ensured |
2. Complete Inspection for each unit before out of factory, covering water system and electricity detection and testing, ensuring 100% right product before shipment . |
3. Strict quality control during production. We have liquid soap
detection, halogen detection, electrical detection and
water-soaking detection during production to avoid gas leakage and
electrical problems |
4. Full inspection on bigger parts such as compressors, condensers,
evaporators, expansion valves, flow switches, controllers etc.
Selection inspection for small parts such as sensors, pressure
switches etc. |
5. Well noise control by using mute cotton for casing plates and
soft rubber feet for floating compressors, some of the models use
compressor isolation shields. |
6. Well insulated with insulated cotton for every pipe and parts,
include compressor, dryer filter and each pipes. |
7. We have passed TUV and SGS inspections. We have CE, Ro HS, IEC, CCC, CB certificates for most of our products. Some of our products have en14511 test, en14825 test. |
.
FAQ
Q1. Can I have a sample order for Heat pump or Water tank?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.
Q2. What about the lead time?
A: Sample needs 3-10days, mass production time depend on the products' quantity.
Q3.Do you offer guarantee for the products?
A: Yes, 12 months since the heat pump depart from the port of loading (Refer to the Bill of Lading).
Copeland compressor photos


Certificate we have got :
1> ISO 9001, ISO 14000
2> Our company has been inspected and certificate by EMC
3> CE And EN14511, EN 14825-ERP for heat pump exported to Europe
4> Energy label for all heat pump models sold to over sea market
5> Testing laboratory calibrated by CNAS

|