| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Precision Steel Tube |
|---|---|
| Brand Name: | Torich |
| Model Number: | EN10305-2 |
| Certification: | ISO |
| Place of Origin: | Zhejiang China |
| MOQ: | 5 Tons |
| Price: | USD 800-1000 per Ton |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 500 Tons per Month |
| Delivery Time: | 3-5 Weeks |
| Packaging Details: | In wooden Boxes |
| Surface Treatment: | Black |
| Technique: | Cold Drawn |
| Type: | Seamless |
| Material: | Carbon Steel |
| Usage: | Machinery Industry |
| O.D: | 20-350mm |
| W.T.: | 1-35mm |
| L: | max12000mm |
| Company Info. |
| TORICH INTERNATIONAL LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |
Please specifiy the final heat treatment when sending the enquiry.
1. Standard:
EN10305-2 Cold Drawn Precision Seamless Steel Pipes
2. Steel Grade:
E155,E195,E235,E275,E355, other materials upon agreement with customers.
Steel Grade and Chemical Compositions
| Steel Grade | C | Si | Mn | P | S | |
| Steel Name | Steel Number | max | max | max | max | max |
| E155 | 1.0033 | 0.11 | 0.35 | 0.70 | 0.025 | 0.025 |
| E195 | 1.0034 | 0.15 | 0.35 | 0.70 | 0.025 | 0.025 |
| E235 | 1.0308 | 0.17 | 0.35 | 1.20 | 0.025 | 0.025 |
| E275 | 1.0225 | 0.21 | 0.35 | 1.40 | 0.025 | 0.025 |
| E355 | 1.0580 | 0.22 | 0.35 | 1.60 | 0.025 | 0.025 |
3. Production method:
Cold drawn on the weled steel tubes, to reach high accuracy on the
OD and WT tolerance
4.Size range:
O.D.:20-350mm W.T.:1-35mm L:max12000mm
5. Packing:
In Hexagonal Bundles, with anti-rust oil protection, with seaworthy
packing
6.Deliver condition:
100% of our steel tubes are dimensionally checked
100% of our steel tubes are visually checked to assure they have a
perfect surface condition and no surface defects.
100% eddy current test and ultrosonic test to eliminate
longitudinal and transversal defects.
FAQ
Q: Are you trading company or manufacturer ?
A: A professional steel pipes materials inventor, manufacturer and
solution provider
Q: How long is your delivery time?
A: Generally it is 7-14 days if the goods are in stock. or it is
30-60 days if the goods are not in stock, it is according to
quantity.
Q: Do you provide samples of carbon seamless steel tube ? is it
free or extra ?
A: Yes, we could offer the sample for free charge but need pay the
cost of freight.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
|