Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Building Coating >

Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

Categories Decorative Powder Coating
Brand Name: Greentech
Model Number: 3524
Certification: SGS
Place of Origin: Tianjin,China
MOQ: 500kg
Price: $2.6-5.8/kg
Supply Ability: 1000 tons per month
Packaging Details: 20kg/carton
Raw Material: Epoxy Polyester Hybird resin
Color: Ral color
usage: indoor
Gel time: 250±50
Application Method: Electrostatic spray
Gloss: high/Low/Matt
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

electrostatic epoxy polyester resin powder coating


Feature:

  1. Excellent adhesion, flexibility, impact resistance, high hardness. Good flow property, vividness, fullness, saturation, beautiful decoration.
  2. To improve the reaction rate of the material, to enhance the effect of seculars reflection, light saturation capacity. Reflection effect, decorative effect is improved.
  3. The protection of pigment is much better.
  4. Giving coating more functional elements according to the different requirement, such as waterproof and rust-proof.
  5. Make the powder coating easy to reach grooves, corner.
  6. Powder rate is high, the coating with high efficiency, spraying area is large, the cost is lower than the paint coating.
  7. Environmental protection, excluding volatile matter, no smell of paint, do not contain heavy metals and polybrominated biphenyl (certification testing by SGS), in line with the international general standards, without any toxic and side effects

ItemTest standard and methodTest
AppearanceColor uniform, loose without blocking, dry coating liquidity 120—140mmvisual
colorAs customer requiredChromatic meter
AdhesionGB/T9286-1998ISO24090 class
Impact resistanceGB/T1732-1993ISO627250kg.cm
flexibilityGB/6742-1986ISO15193mm
Cupping testGB/T9753-1993ISO15208mm
Pencil hardnessGB/T6739-1996ASTM/D33631H-2H
Salt spray testingGB/T1771-1991ISO7253> 500hour
Heat resistance150℃/24 hours(white)<0.5
Humid and hot resistanceGB/T1740-1979ISO6270>1000hous

Application areas: air conditioning, refrigerator, microwave ovens, cooking hoods electric kettles and other household appliances shell

Buy Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant at wholesale prices
Send your message to this supplier
 
*From:
*To: Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0