| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Strapping Band Machine |
|---|---|
| Brand Name: | Aorui |
| Model Number: | PET90 |
| Certification: | CE UL CSA |
| Place of Origin: | China |
| MOQ: | One set |
| Price: | Negotiable |
| Payment Terms: | T/T L/C |
| Supply Ability: | 10 Sets per month |
| Delivery Time: | 30 days |
| Packaging Details: | Fumigation wood, film,pallet,etc or according to customer’s requirement. |
| Raw material: | PET PP |
| Product color: | According to customer's requirement |
| Place of original: | Shandong , China |
| Model number: | PET90 |
| Port of shipment: | Qingdao |
| Screw&Barrel material: | 38Cr MOAIA |
| Warranty: | 1 year |
| Company Info. |
| QINGDAO AORUI PLASTIC MACHINERY CO.,LTD1 |
| Verified Supplier |
| View Contact Details |
| Product List |
Plastic pp Strap Band Extrusion Machinery , PP Strapping Making Machine , Plastic Strapping Band Production Line
Quick detail:
Features:
Description:
Application
Widely used in ceramic,floor board ,floor tile,paper making ,
wooden product ,spinning product, cotton ,nonferrous metal ,
chemical product ,electric power or cable,and tray band of goods,
as a newly rising product.
Technical Flow chart
Cakeflour material-recycle→Parrellel Double screw
Pelletizing→solid phase wetness→Melting Extrusion
(Carbonic-acid- beverage bottle piece material)
→Salivate casting piece →1st Stretching→2nd Stretching→intension forming→Rolling and Packing
Technological parameter:
| Model | SJ-65 | SJ-75 | SJ-90 |
| Extruder | SJ-65/30 | SJ-75/33 | SJ-90/33 |
| Productivity | 60-100kg/h | 80-120kg/h | 120-150kg/h |
| Drive Motor | 22kw | 30kw | 55kw |
| Two-station Winder | 60-120m/min,adjustable | ||
| Strap Size | Width:5mm-20mm | Width:10mm-25mm | Width:20mm-35mm |
| Thickness:0.36mm-1.0mm | Thickness:0.5mm-1.3mm | Thickness:0.5mm-1.8mm | |
| Installed Capacity | about80kw | about 90kw | about110kw |
| Line Dimension | 30m×2m×2.2m (L×W×H) | 30m×3m×4.5m (L×W×H) | 30m×5m×6m (L×W× |
Technical and after-sales service:
The supplier the following technical and after-sales service
commitment
A) Provide on-site installation guide;
B) Responsible for the commissioning of equipment;
C) Responsible for the buyer's personnel mount guard before the
operation and maintenance training;
D) One year free warranty (due to the buyer's improper operation
caused by damage charge costs), and ensure the supply of spare
parts for a long time, only receive the cost.
E) Provide technical advisory services for a long time

|