| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Connector Mold Parts |
|---|---|
| Brand Name: | Kingrui |
| Model Number: | KR011 |
| Certification: | ISO9001:2008 |
| Place of Origin: | Dongguan, China ( Mainland ) |
| MOQ: | 1 Pcs |
| Price: | Negotiable |
| Payment Terms: | T/T 50% as deposit 50% before shipment |
| Supply Ability: | 1200-1500 units per month |
| Delivery Time: | Normally, simple parts, 5-7 days, complicated parts, 7-15 days. According to QTY and the complexity of drawing. |
| Packaging Details: | Anti-rust Oil, PE film covered first, Plastic box, then carton |
| Product Name: | OEM Small Size Grinding Machined Plastic Connector Mold Parts |
| Shaping Mode: | Plastic injection mould |
| Product Material: | Tool Steel as request |
| Process: | Grinding, EDM, Wire Cutting etc |
| Grinding Tolerance: | +/0.002 |
| EDM Tolerance: | +/-0.005 |
Plastic Standard Mould Parts OEM Small Size Grinding Machined KR011
Part Description
1. Materials: SKD61/SKD11/SKH51/1.2344/8407/P20/SUS/HSS/AL...etc
2. Spare parts fabrication for Over 10 years
3. Software for drawing: pro/E, auto CAD, UG, CAD,PDF and Solidworks2008 flow analysis
4. Further machining work: Grinding, EDM, Wire Cutting, Drilling, CNC
5. Surface finish process: Polishing, Sandblasting, chromate plating, power coated and anodizing
6. Application industries: auto parts, electronic parts, medical parts, home appliance and other industrial uses
7. Made according to customer's drawings, specifications or sample
Quality control:
| KINGRUI IS ISO9001:2008 Certified. The philosophy of Quality emphasizes on: | ||
| ||
Further Details
| Material Available | SKD-11,SKH-51,SKD61,SKH51,H13,etc. |
| Material Brand | ASSAB / SAARS TA / DAIDO / HITACHI, etc. |
| Tolerance | Usually +/0.01mm as your request |
| Machine Type | Plastic Injection mold parts |
| Finish | Polishing and coating, according to the drawing request |
| Package | Anti-rust oil ,PE film covered , Plastic box, carTon . If need any special packing please inform us |
| Delivery time | 5-15 Working days, depends on the quantity the order. Express by DHL, UPS, FEDEX, TNT etc. |
| Inspection | 100% inspection before products leave the factory |
Our Services

|