| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Prefabricated Steel House |
|---|---|
| Brand Name: | Sussman |
| Model Number: | SU-PH |
| Certification: | CE; ISO |
| Place of Origin: | China |
| MOQ: | One 20 GP |
| Price: | USD4500 per peice |
| Payment Terms: | L/C, D/P, T/T, D/A |
| Supply Ability: | 100 pieces per month |
| Delivery Time: | 10-15 days |
| Packaging Details: | plastic film |
| Type: | Prefab House |
| Thickiness of steel: | 2.0mm |
| Thickiness of roof panel: | 50mm |
| Use: | Carport, Hotel, House, Kiosk,Booth, Office, Sentry Box |
| Thickiness of wall panel: | 50mm |
| Wind resistance: | Grade 11 |
Steel Structure Ware House Construction Steel Structure Prefab Housing/Light Steel Prefabricated House For Mining
Features:
1) Unit figure for K house dimension is K. 1k=1.82m.
2) K house can be done as 1 floor, 2 floors or 3 floors building. Figures for house with different stories: One floor=3P, two floor=6p, three floor=9p
3) K house is commonly used with qualified water proof, fire proof, heat insulation and sound insulation performance.
4) K house use Reusable materials and is more environment friendly compared to traditional buildings. It can be assembled and disassembled six times.
5) K house is Anti worm and ant. All steel structures are well painted and anti-rust which can be normally used for over 15 years with very limited amount of building wastes.
6) K house only requires level concrete floor for the foundation.
7) 6 labors one team, each day can install more than 300 m2.
| Wind resistance: | Grade 11 |
| Earthquake resistance: | Grade 7 |
| Snow load capacity of roofing: | 0.6kn/m2 |
| Live load capacity of roofing: | 0.6kn/m2 |
| Wall permitted loading: | 0.6kn/m2 |
| External and internal wall heat transmission coefficient: | 0.35kcal/m2hc |
| Second floor load capacity: | 180kg/m2 |
| Live load of corridor: | 2.5kn/m2 |
| Density of Rock wool: | 60 kg/m2 |
| Density of PU: | 40 kg/m2 |
| Density of EPS: | 12 kg/m2 |
| Density of IEPS: | 20 kg/m2 |
| Delivery time: | Normally 20-25 days |
| Container loading: | 320m2 |
Details





|