| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Seamless Steel Tube |
|---|---|
| Brand Name: | TORICH |
| Certification: | ISO 9001 ISO 14001 TS 16949 |
| Place of Origin: | Zhejiang,China |
| MOQ: | 1 Ton |
| Price: | negotiable |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 10000 Ton/Year |
| Delivery Time: | 15-30 days |
| Packaging Details: | Packing in wooden, hexagonal box or other seaworthy ways |
| Product Name:: | TORICH 42MM Diameter 60MM Stainless 48 inch Steel Pipe |
| Keyword:: | 42MM Diameter Stainless Steel Pipe |
| Material:: | SUS 304/316 ASTM 304/316/321 EN 1.4301/1.4541/1.4404 |
| Shape:: | Round |
| Usage:: | Scientificresearch, Aerospace Industry , Pneumatic Components, Instruments |
| OD:: | 4-50mm |
| WT:: | 0.5-12mm |
| Length:: | Max 12m |
| Company Info. |
| TORICH INTERNATIONAL LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |
Torich is a manufacturer and trader for Annealed and Pickled Thin Wall Stainless Steel Tubing, with grade TP304/304L, TP316/316L, the products are exported to over 30 countries worldwide.
321 stainless steel
Size:ANSI /ASME size is under,other standard of size is for ready choice
O.D.:4.0-50mm
W.T.:0.5-12mm
Length:Max.12 Meter
NPS 1/8''-48''
Schedule:5/5S,10/10S,20/20S,40/40S,80/80S,120/120S,160/160S
according to ANSI B36.19/36.10
Stainless Steel Pipe Surface finish:Annealed,Polished
Process Method:Cold Drawn/Cold Rolled
Delivery Condition:Annealed & Pickled
Torich's Chemical assurance
1. Each lot of raw materials will be tested by spectrometer before
put in storage.
2. 100%PMI the mother pipe to ensure we put right material.
2. 100%PMI the finished pipe again to ensure we produced right
grade
Heat Treatment Assurance
A full-automatic natural gas furnace with 24 meters in length.The
real temperature tolerance could be within 10℃.
Application:Fluid and gas transport,Structure and machining.
Packing:Bundles for each piece then packed in seaworthy wooden cases.
A: A professional steel pipes materials inventor, manufacturer and solution provider
A: Generally it is 7-14 days if the goods are in stock. or it is 30-60 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us
TORICH 42MM Diameter 60MM Stainless 48 inch Steel Pipe
|