| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Forged Gear Blanks |
|---|---|
| Place of Origin: | Jiangsu |
| Brand Name: | steel ring blank |
| Certification: | ISO 9001:2008 |
| Model Number: | Customized |
| MOQ: | 1 pc |
| Price: | 15usd to 3000usd |
| Packaging Details: | Box Or Wooden Package |
| Delivery Time: | 7-25 working days |
| Payment Terms: | L/C, T/T, Paypal |
| Supply Ability: | 3000 tons/month |
| Forging Tolerance: | +/-0.1mm |
| Technology: | Forging with Precision Maching |
| Transport Package: | as The Order |
| Surface Treatment: | Sand Blasting |

Hot Forging SAE4140 34CrNiMo6 Steel Pinion Gear
Specifications
Option: C45, 39NiCrMo3, 40CrNiMoA, SAE 4320, 36Mn5
Surface: Machining
1: Processing high quality steel turbine shaft
2: Materials: C45, 39NiCrMo3, 40CrNiMoA, SAE4320, 36Mn5
3: Measurement: Max outside dia: 3200, weight: 30 tons.
| Product Name | Specification(mm) | Material |
|---|---|---|
| Forged Round Bar | OD:Φ200-Φ1000 Weight≤18T Length≤12000mm | 18CrNiMo7-6, 42CrMo,34CrNi3Mo, 35CrMo,4330V |
| Forged Hollow Bar | OD:Φ200-Φ1000 Weight≤18T Length≤9500mm | 18CrNiMo7-6, 42CrMo,34CrNi3Mo, 35CrMo,4330V |
| Forged Module | Width≤1000mm | H13, 5CrNiMo, 5CrMnMo,etc |
| Forged Shaft | DiameterΦ80-Φ1000 Length≤12000mm Weight≤18T | 40Cr,45#, 42CrMo, 40CrNiMo,etc |
| Forged Roller | Diameter≤Φ1000mm | 86CrMoV7, 9Cr2Mo, MC3,MC5,etc |
| Forged Ring&Disc | OD≤Φ1500mm Thickness≤500mm | 20CrNi2Mo, 40Cr,42CrMo, 21CrNiMoV47,etc |
Detail description:
1: Name: Gear shaft
2: Proces: Heat forging
3: Certificates: ISO9001-2000, SGS
4: Products ability: Max length: 1--16m, Max OD: 3m
5: Surface: Polishing or per costomer's requirement
Products range:
Die Forging, Main Shaft, Wind Power Shaft, Stabilizer, Flange,
Coupling, BOP Body, Tube Plate, Roller Forging, Roller Shell, Ring
Forging, Gears, Gear Blank, Gear Shaft, Gear Wheel.
Packaging Details:Delivery Detail:
| wooden or steel package seaworthy packing |
| about 35 days from order or as per customer requirement |
FAQ
1.Trade term:FOB/CIF/CFR.
2.Payment term:T/T or L/C.
3.Inquiry: Please show me drawings and detail technical
specifications
4.Delivery Detail:about 35 days from order

|