| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Diesel Engine Driven Fire Pump |
|---|---|
| Brand Name: | NM FIRE |
| Model Number: | Split Case Pump |
| Certification: | UL /FM/Non-listed/NFPA20 |
| Place of Origin: | China |
| MOQ: | 1set |
| Price: | Negotiation |
| Payment Terms: | L/C, T/T |
| Delivery Time: | 60 Days |
| Packaging Details: | Export Packing |
| Standards: | NFPA20, UL, FM Non-listed |
| Color: | Red |
| Controller: | Tornatech/Eaton (UL/FM/Non-listed |
| Categories: | FIRE FIGHTING PRODUCTS, FIRE PUMP GROUP |
| Capacity: | 2000GPM |
| Appllication: | FIre fighting |
| Company Info. |
| Wuhan Spico Machinery & Electronics Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
| Model: | SCF200-150-330 |
| Flow(GPM): | 2000 |
| Head(PSI): | 107-190PSI |
| Type: | Centrifugal fire pump-Split Case |
| Flange ratling | Class 250 ,RF |
Diesel Engine Pump Set ( Heat Exchanger) | Pump: Model:SCF200-150-330(UL/FM) Q= 2000usgpm H=171psi n=2950 rpm Material: Casing---Ductile Cast iron Impeller---SS304 Shaft--- AISI 4340 Shaft sleeve---SS304 Seal------ Gland packing Wear ring----Bronze Bearing---SKF | |||||||||||||||||||||||||||
| Engine: NM FIRE(UL) Model: NM6-108E 335HP at 2950rpm | ||||||||||||||||||||||||||||
| Controller : Tornatech(UL/FM) Model: GPD-24-120/220 | ||||||||||||||||||||||||||||
| Flowmeter | (FM)(Grooved pipe) Model:8"-2000-G | |||||||||||||||||||||||||||
| Fuel tank | Newberry Tanks(UL) Gallon:400 | |||||||||||||||||||||||||||
| Main relief valve | CLA-VAL(UL@FM) Model:2050B-4KG1 6"(100-300psi) | |||||||||||||||||||||||||||
| Waste cone | Model:6"-10" | |||||||||||||||||||||||||||

UL | Q: 100-750GPM H:70-152PSI |
FM | Q: 100-750GPM H:70-152PSI |
CCCF | Q:15-45L/S H:0.6-0.9Mpa |
NFPA20 | Q: 100-3000GPM H:40-200PSI |
DESCRIPTION: Value Added Systems • 3D design built in a NFAP20 engineering environment with the
highest quality Standards • All main components are UL/FM Listed and Approved products • Complete system is pressure tested prior to shipment to eliminate
on-site leaks • All interior piping and electrical connections are complete • Factory assembly and testing eliminates the need for on-site
assembly • Enclosure floor is coated • Superstructure design supports the system piping, exhaust piping
and electrical components from the roof, allowing for more open
floor space • Wall insulation reduces environment noise • Includes all auxiliary systems prescribed by NFPA20 including: • Heating • Lighting • Sprinklers • Ventilation • Drainage


|