4412 6MPa Sinter HIP Furnace For Cemented Carbide Materials

Categories Sinter HIP Furnace
Brand Name: Ruideer
Model Number: 400*400*1200
Certification: CE;ISO9001;ISO14001;OHSAS 18001;GB/T29490
Place of Origin: China
MOQ: 1 set
Price: Negotiable
Payment Terms: L/C, T/T
Supply Ability: 8 sets/month
Delivery Time: 100-120 work days
Packaging Details: Exempted from inspection wooden case
Service life: 20 years
Operating times: 300 times/year
Heating power: 280KVA
Painting: black,white,gray,blue,green
After sales: Engineer can be dispached to foreign country to finish the installation and commissioning work
Warranty period: 12 months
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

4412 6MPa Sinter HIP Furnace For Cemented Carbide Materials

4412 sinter-HIP furnace apply to high-performance cemented carbide materials


Main application
For dewaxing of high-performance cemented carbide material(It can realize vacuum dewaxing,H2 dewaxing,binder can be paraffin or PEG),Vacuum sintering,Low pressure Argon dynamic partial pressure sintering,High pressure Argon sintering,cooling,heat preservation and heating up under high temperature high pressure status.


General structure
This kind of vacuum pressure sintering furnace for cemented carbide r
search, which is single room,horizontal type,recycle heating furnace,it adopt graphite heating element of low voltage and large current .It has many heating zone,each heating zone are individual controlled .All the technical process is automatic controlled,monitored,chased,fault diagnosed which showed and recorded by computer.
This Sinter-HIP furnace include control system,heating system,dewaxing system(vacuum dewaxing and H2 dewaxing),vacuum system,partial pressure sintering,pressure sintering system,cooling water system,rapid cooling system,auxiliary system and safety system etc.It’s graphite box built-in insulation structure,must keep the best temperature and atmosphere uniformity when sinter cemented carbide products.Main parts are all international advanced products,can meet production needs stably and in the long term.At the same time,it must meet energy conservation and environmental requirements.


Technical parameters

Basic technical parameter

Service life

6000times / 20-years service life


Useful space

400 x 400 x 1200mm

Max. Loading weight



≥300kg(According to Sinter products and loading space)


Max. Designed temp.


1600℃(Heating temperature)


Max. Working temp.

1550℃

Max. working pressure

58bar

Ultimate vacuum degree

1pa(After heating,cold,empty,dry condition)


Pumping speed


The vacuum degree up to 5 pa within 30min after starting pump,the vacuum degree can get to 3pa after pumping continually within 30min,(after empty sintering,in empty,clean,cold condition)

Leakage rate (In average 24h)


2pa/h(After testing ultimate vacuum,under empty cold,clean condition,test in average 24h)


Wax-collection rate


≥98% (Ar dewaxing with 10kg wax absolutely, average not more than 3 times )


Max. Ramp up rate


8℃/min(Room temperature ramp up to 1450℃ in vacuum,empty loaded condition,can be soaked in process when 600℃,1000℃ and 1200℃.

≥5℃/min when Fully loaded


Pressurized time



≤20min Can be set(When Gas source keep around 130bar,pressurized to required pressure)


Cooling time


≤6~7h(From 1480℃ drop to 100℃ when fully-loaded,water temperature≤28℃ )

UPS time


Supply power to indicator and to control furnace when power-off, Keeping time≥80min


Temperature uniformity


YG8 or YC40 control inserts to test:Magnetic saturation deviation after debinding ≤±0.25%,

Coercivity deviation≤±0.3KA/M


Temperature gradient


≤±7℃ (Vacuum sinter to 1450℃,Put ceramic FERRO of grade 334 on flat graphite boards(ceramic FERRO supplied by buyer) ,empty condition,can be soak in process,this test result only as reference)

Heating power

280KVA,Suggest user’s inlet wire:≥180mm2


Temp.measurement Mode


WRe5-26 double-core single thermocouples,mutually redundant,stable and reliable

Temperature control mode

3-zone temp. Control


After sales:

1. Installation, Commissioning And Acceptance

We do installation, commissioning and acceptance in buyer's plant.During the installation and commissioning period, the commissioning personnel shall be provided free of charge by the demander according to the staff standard.

The equipment shipped to the buyer, the seller received the buyer's notification, both within a week to carry the equipment out of the box together, then check the equipment and all components according to the packing list . Including equipment accessories, spare parts and special tools, attached manual and technical documents, etc. It can be installed after the acceptance check of equipment.
After installation and debugging, the equipment shall be accepted according to the technical accessories.


2. Training

When taking-over the Furnace to the customer, We will give a staff training to customer. The operating personnel of the customer should join to commission,test the furnace, when installing at customer’s company.
This is practical operation training and practical maintenance training,and our technical personnel will telling the basic principle,equipment maintenance knowledge,And the common fault handling measures.We can training 2 ~ 3 workers. ( Training how to maintenance and operating.)


3. Warranty period

The warranty period of the equipment is 12 months, which starts from the date of installation and debugging of the supplier. Equipment failure happens, after-sales service personnel shall give solutions within 2 hours, after receiving the buyer's notification . If it is need to go to the site for treatment , operators dispatched by seller should arrive at the site within 48 hours after go aboard. In case of emergency,operators should arrive at the site within 48 hours after go aboard, and continue to make repairs until the fault is removed and the equipment returns to normal.


Buy 4412 6MPa Sinter HIP Furnace For Cemented Carbide Materials at wholesale prices
Send your message to this supplier
 
*From:
*To: Zhuzhou Ruideer Metallurgy Equipment Manufacturing Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0