Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Rolling Mill >

High Speed Stainless Steel V Band Clamp Roll Forming Machine

Categories Cold Roll Forming Machine
Brand Name: Co-effort
Model Number: GD140
Certification: CO,CE,FORM A, FORM E
Place of Origin: China
MOQ: 1 set
Price: USD 40000/set
Payment Terms: T/T
Supply Ability: 10 sets for 75 working days, usually have stock
Delivery Time: 75 working days
Packaging Details: Plastic Film and Wooden Case
Name: V Band Clamp Roll Forming Machine
Hoop Barrel Clamp Ring Material: Metal Steel
Thickness of Coil: 0.8mm to 3mm
Width of Coil: 30mm ~ 100mm
Material of Rollers: Cr12Mov
Driven Way: Gear Boxes
Color: As your requirement
Driven Motor: Servo Motor
Power: Around 40KW
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

High Speed Stainless Steel V Band Clamp Roll Forming Machine

High Speed Stainless Steel V Band Clamp Roll Forming Machine


Application of V Band Clamp Roll Forming Machine


This kind of roll forming machine can use all metal steel as raw material, through decoiler, straightening, roll forming and cutter processes, it can produce all kinds of clamps.


Technical Configuration


NoItemsTechnical Requirements
1

Production Process


De-coiler --- Leveling --- Roll Forming --- Rolling Head --- Cut off
2Floor Area15×2.5×2(L×W×H)M
3Feeding DirectionFrom Right to Left
4Voltage415V,50Hz,3 Phase
5Air SupplyFlow Rate:0.5m³/min; Pressure: 0-0.7MPa
6Hydraulic Fluid46#
7Gear Oil150#
8Material of StripStainless Steel
9Width of Strip≤80mm
10

Thickness of Strip

≤2.8mm
11Speed15 components per minute for diameter 300mm
12Length Tolerance±0.5mm
13Total PowerAround 35 KW

Technical ParametersTypeGD100
Passes8
Driven MethodIndependent Gearbox
Forming Passes

Material 45#

High precision guide pillar bracket. Visual display is used to adjust the upper and lower rollers.

Passes Pitch200mm
Width of CoilMax. 80mm
Thickness of CoilMax. 3.0mm
Diameter of ShaftsΦ50mm Material: 42CrMo Hardening treatment

Material of Roller


Cr12Mov Hardness: HRC60-62°
Main Driven Servo Motor11KW+1.5KW
Rolling and Cutting Device1 set
Guide Device
Accurate introduction of the first forming wheel, with digital display, detection of head and tail of coils.
Lubrication system
The lubrication system for segment forming will be self-contained within the machine. The excess lubrication from the forming process will be re-circulated, filtered and re-used.

Control System


Any control cabinet which includes power supply, single or three phase power must be fitted with an isolator which only allows the cabinet to be opened when the isolator is switched to the off position.

The operator controls will be mounted in a location, which best suits, the safe operation of the machine. Controls that are essential to the operation of the machine must be placed outside the guarding.

All PLC programmes and any on-screen instructions must be in the English language.

At least one Emergency stop will be fitted at the operator position and others, as the machine design requires.

FAQ


Q: What’s the diameter range your roll forming machine can do of v band clamps?

A: Min. diameter is 55mm, the max. diameter is 800mm.


Q: What products can this machine produce?

A: Auto V-band Clamps, ring clamps, G coulpings, Flanges, Gaskets, Aircraft Clamps


Q: What is the production speed?

A: Our company adopts servo motor, the speed can be controlled, according to the material thickness and diameter of the product, all of which can meet the requirements of customers.


Equipment performance acceptance


1. Before the equipment is shipped, the designer and the buyer will send the technical personnel to the seller's equipment manufacturing site for equipment acceptance, acceptance according to the agreement and the relevant provisions of the state.

2. If there is any discrepancy or failure to meet the standard requirements of Equipment Acceptance, the seller should take measures to deal with until the requirements are met.


Equipment installation and debugging


1. After the arrival of the goods to the destination, the behalf of the buyer take pictures of the appearance of the goods and check the number of goods, if found inconsistent, please immediately notify the seller to confirm that, if the seller reason, the seller settlement, other reasons negotiation to resolve.

2. Equipment to reach the destination, with the installation conditions, the buyer promptly notify the seller, the seller should be within 5 days to send qualified engineering and technical personnel to the buyer equipment installation site guidance equipment installation, is responsible for equipment commissioning.

3. The seller is responsible for the commissioning of the equipment and instructs the purchaser to try production until the equipment produces a qualified product of various specifications.

4. The hydraulic oil, gear oil, saw blade, cooling water tank, cable and material used in commissioning shall be provided by Buyer.


Contact Us

Yvonne Chan

Jiangsu Co-effort Mechanical&Electrical Technology Co., Ltd.

Wuxi Co-effort Machinery Manufacturing Co.,Ltd.

Office Address: B-613,Tempo Business Building , Yangshe Town, Zhangjiagang City, Jiangsu Province, China 215600

Factory Address: No.11, Shashan Road, Huashi Town, Jiangyin City, Wuxi City, Jiangsu Province, China 214421

Website: www.coldrollforming-machine.com

Tel/Whatsapp/Wechat: +86 13584478980

Email: fancymachinery@outlook.com


Buy High Speed Stainless Steel V Band Clamp Roll Forming Machine at wholesale prices
Send your message to this supplier
 
*From:
*To: Jiangsu Co-effort Mechanical&Electrical Technology Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0