| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Reverse Osmosis Water Purification Equipment |
|---|---|
| Brand Name: | HJ |
| Model Number: | Customized |
| Certification: | ISO 9001:2008,ISO14001,CE |
| Place of Origin: | Guangdong, China (Mainland) |
| MOQ: | 1 Unit/Units |
| Price: | negotiable |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 1000 sets per year |
| Delivery Time: | 7-10days after payment arrived |
| Packaging Details: | Carton or Wooden case |
| Technology: | Pretreatment Filter+RO |
| Contral System: | PLC+HMI Auto And Manual |
| Pipeline: | UPVC. SS304 |
| Pump: | CNP Or Grundfos |
| Control Valve: | Auto Multiway Valve |
| Sea Port: | Shanghai, Chongqing, Shenzhen |
| High Light: | Reverse Osmosis Water Purification Plant, Borehole Reverse Osmosis Water Treatment Equipment |
Borehole Water Purification Equipment,For Irrigation / Drinking
Features and applications:
Specification
| NOS. | Items | Information |
| 1. Pre-treatment part | ||
| 1.1 | Sand filter | Remove turbidity, SS matter, organic matter, colloid, etc. |
| 1.2 | Active carbon filter | Remove color, free chloride, organic matter, harmful matter, etc. |
| 1.3 | Water softener | Soft water and reduce it's hardness. |
| 2. RO part | ||
| 2.1 | High pressure pump | Provide power for RO. |
| 2.2 | PP filter | Prevent large particles, iron, dust, SS matter, impurity into RO membrane. |
| 2.3 | RO membrane | Remves: lead, cooper, barium, chromium, mercury, sodium, cadmium, fluoride, nitrite, nitrate, and selenium. |
| 3. Electricity control system | ||
| 3.1 | PLC+Touch screen control system | Impored from SIEMENS,WeiNveiw |
| 3.2 | Electrivity components | Schneider, Chint |
| 3.3 | Pipe and fitting | Adopt domestic famous brands,UPVC/ Stainless steel material |

How to service
100% factory tested before shipment
One Year's Quality Warranty
1.Pre-sales Service
--General technical advice and business consultation.
--Suitable scheme and equipment as order.
--Designing as special requirement.
--Complete plan with technology and production line equipment.
2. After-sales Service
-- One year warranty.
--Inspecting equipments in every working procedure.
--Assisting foundation construction.
--Dispatching engineer to install and debug.
--Training the first-line worker on site;
--Visiting clients and solving production problem.
--Life-long maintenance service.
--Technical support.
|