| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Heat Exchanger Tubes |
|---|---|
| Brand Name: | TORICH |
| Model Number: | ASTM A556 |
| Certification: | ISO9001; ISO14001; TSI16949 |
| Place of Origin: | ZheJiang,CHINA |
| MOQ: | 3 tons |
| Price: | negotiable |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 60000 Ton per year |
| Delivery Time: | 30-35 days |
| Packaging Details: | packing in wooden boxes or in hexagonal bundles |
| Product name: | ASTM A556 Seamless Cold Drawn Carbon Steel Tube Boiler Tube for Tubular Feed Water Heaters |
| Product Keyword: | Seamless carbon boiler steel pipe |
| Application: | For boiler pipe, smoke pipe, heat-exchanger and chemical industry |
| Secondary: | Non-secondary |
| Section shape: | Round |
| Grade: | A2, B2, C2 |
| Company Info. |
| TORICH INTERNATIONAL LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |
Order Information:
OD: 5/8’’- 1 1/4” (15.9-31.8mm)
WT: ≥ 0.045’’ 1.1mm
OD Tolerance : 0,+20%
Chemical Requirement :
Element | Composition ,% | ||
| Grade A2 | Grade B2 | Grade C2 | |
| Carbon, max | 0.18 | 0.27 | 0.30 |
| Manganese | 0.27-0.63 | 0.29-0.93 | 0.29-1.06 |
| Phosphorus, max | 0.035 | 0.035 | 0.035 |
| Sulfur, max | 0.035 | 0.035 | 0.035 |
| Silicon , min | ... | 0.10 | 0.10 |
Hardness Requirement:
| Grade A2 | HR B 72 |
| Grade B2 | HR B 79 |
| Grade C2 | HR B 89 |
| Grade A2 | Grade B2 | Grade C2 | |
| Tensile strength,min,ksi(Mpa) | 47(320) | 60(410) | 70(480) |
| Yield Strength,min,ksi(Mpa) | 26(180) | 37(260) | 40(280) |
| Elongation in 2 in or 50min, min,%(longitudinal) | 35 | 30 | 30 |
Product show:
Q: Are you trading company or manufacturer?
A: We are a professional steel pipes materials manufacturer.
Q: How long is your delivery time?
A: Generally it takes 7-14 days if the goods are in stock or 30-60 days if there is no stock, this mainly depends on quantity.
Q: Do you provide free samples?
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
Q: What is your terms of payment?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T
in advance ,balance before shippment.
If you have another question, pls feel free to contact us.
|