Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home >

0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

Categories Water Turbine Parts
Brand Name: Wawushan
Place of Origin: China
MOQ: 1
Price: negotiable
Payment Terms: T/T
Supply Ability: 1+unit+4 months
Delivery Time: 120 wordking days
Packaging Details: plywood
runner material: stainless steel
diameter: 0.8 m
machine type: Kaplan
blade No: 18 PCS
weight: 400 kg
brand: Wawushan
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator

Stainless Steel Water Turbine Parts Turgo Wheel For Generator


The Turgo wheel is basically an improved version of the Pelton.The maximum efficiency of animpulse wheel is achieved when the velocity of the runners at the centerline of the nozzle is half the velocity of the incoming water. To achieve the highest velocities the ratio of the diameter of the wheel and thediameter to the center of the nozzle should be as small as possible..The wheel has a minimum ratio of 9:1, the Turgo has a minimum ratio of 4:1. The Turgo is half the size of the Pelton and operates at twice thespeed. This makes the unit cheaper and reduces the amount of gearingnecessary. The Turgo has an efficiency of over 80% and runs on head of 40 feet or more.


specification


runner materialstainless steel
runner typeKaplan
diameter0.8 m
capacity200kw
blade No18PCS
weight400KG

The package of Project


a. Verification of documents submitted
b. Audition of documents by the authority
c. Signing the contract
2. Engineering Design
a. Selection of a complete set of equipment according to the request or Runh Power's recommandation or the request from the commissioner.
b. Design of overall layout and all the sub-systems within the parameter of power plant.
c. Selection of personnel participating in the project
d. Submission of technical solution to the commissioner for review and approval.
3.Equipment Purchase& Transportation
a.Turbo Generator Set and its auxiliary systems (boiler, condensing water collector, deaerator, high pressure and low pressure superheaters, power distribution system. etc )
b. All the construction material, tools, spare parts and other necessities of the project
4. Civil Construction
a. All the civil construction work within the parameter of power plant
5. Operation & Maintenance
a. Operation of power plant (technical counseling)
b.Regular maintenance and inspection
c.Technical Training Program for Power Plant Personnel
d.General Overhaul
6. Installation & Testing
a.Installation & testing for all systems & equipment provided by Runh Power
b.Installation, testing & trail run of all systems of a power plant
c.Installation, testing & trail run of entire power plant
7. Supply of Spare Parts
a. Long-term supply of spare parts and other consumibles.


Buy 0.8m Water Turbine Parts Turgo Wheel For Hydroelectric Generator at wholesale prices
Send your message to this supplier
 
*From:
*To: Hongya Power Generating Equipment To Utilities Limited
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0