Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Mining Machinery >

Borehole Drilling Machine 200 Meters Depth Small Portable Lightweight Drilling Machine

Categories Borehole Drilling Machine
Brand Name: ShiTan
Model Number: GK-200
Certification: ISO9001
Place of Origin: China
MOQ: 1 set
Price: USD4500-5800/SET
Payment Terms: T/T, Western Union
Supply Ability: 20000 sets per year
Delivery Time: Within 7-12 days
Packaging Details: wooden box
Name: GK 200 Borehole Drilling Rig
Power Type: Diesel
Voltage: 220v
Dimension(L*W*H): 1730*860*1360
Application: water well,railways, core
Type: Small core drill rig
Max Drilling Depth: 200 meter
Drilling diameter: 300 mm
Color: Customized
Warranty: 24 months
OEM: Acceptable
Place of origin: Hebei,China
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Borehole Drilling Machine 200 Meters Depth Small Portable Lightweight Drilling Machine

GK 200 Borehole Drilling Rig


GK 200 Borehole Drilling Rig Description

GK200 is a lightweight shallow hole rig which can be drilling depth max 200M,diamter 75-300mm,with oil pressure feed.Mainly used for geological general investigation and exploration,road and tall buliding foundation exploration


GK 200 Borehole Drilling Rig Tech Data


GK 200 Borehole Drilling Rig
Drilling diameter(mm)75-300mm
Drilling depth (m)200-30m
Drill pipe diameter (mm)42,50
Drilling angle(°)90~75
Equipment size(L * B * H)1730 * 860 * 1360 (mm)
Rig weight (except engine)700
Mobile device
Moving length350mm
Leave distance300mm
Gyrator
Spindle speed (four gear) (r/min)115,230,505,1010
Spindle travel(mm)450
Spindle no-load lifting maximum moving speed(m/s)0.05
Spindle no load drop maximum movement speed(m/s)0.067
Spindle maximum feed pressure(KN)15
Spindle maximum lifting force(KN)25
Spindle maximum output torque(KN• m)1.5
Winch assembly
Winch maximum lifting force (single rope)20
Reel speed (r/min)20,39,85,170
Reel circumferential speed(m/s)0.172,0.345,0.738,1.476
Reel diameter(mm)140
Wire rope diameter(mm)9.3
Wire rope density (m)40
Brake diameter(mm)278
Brake band width (mm)50
Oil pump
Oil pump typeYBC -20/125
Nominal pressure (Mpa)12.5
Rated flow(ml/r)20
Rated speed(r/min)800-2500
Diesel engine or motor
Diesel engine1115
Rated power (KW)16.2
Rated speed (r/min)2200
Rated pressure(Mpa)12.5
Motor typeY160M - 4
Rated power (KW)11
Rated speed (r/min)146

GK 200 Borehole Drilling Rig Main Features


1.Engine:Feed by hydraulic cylinder,the drilling efficiency is higher and it can save labor.
2.Drill rod:53x59 drilling rod adopted,high rigidity and strong delivery torque.
3.Spindle:Vertical spindle are fixed by four groups of bearing to ensure that the rotary machine is rigid
enough for gravel layer and other complex geoloical conditions.
4.Mud pump:Equip mud pump with flow 160L/min,save cost and also make the structure compact.
5.Concentrated handle, small footprint,light weight, strong decomposition, easy to move.


What is the construction technology of de watering well?


Well point measurement and positioning → hole digging and casing embedding → drilling rig in place → drilling → hoisting well pipe → back-filling filter material (coarse sand or gravel) between well pipe and hole wall → hole washing → drainage pump in well pipe and installation of pumping control circuit → trial pumping → normal operation of well point → de watering completion, pipe pulling → well sealing.


The water well drilling rig is maintained at different times


The maintenance of water well drilling rig is very important, which can prolong the service life of the equipment, keep the water well drilling rig in a good operation state for a long time, reduce the maintenance cost and ensure the personal safety of operators.

1. Monthly maintenance:

Thoroughly carry out the items required by shift and weekly maintenance.

Remove the chuck and clean the slip and slip seat. Replace in time if damaged.

Clean the filter in the oil tank and replace the deteriorated or dirty hydraulic oil.

Check the main parts and components. If damaged, replace them in time. Do not work with injuries. Completely eliminate the faults occurred in this month.

If the well drilling equipment is not used for a long time, all exposed parts (especially the surface of the processing surface) shall be coated with grease.

2. Weekly maintenance:

Thoroughly carry out the items required by shift maintenance.

Remove the dirt and soil on the tooth surface of chuck and slip.

Clean the oil and mud on the inner surface of the holding brake.

Eliminate faults that occur within this week.

3. Shift Maintenance:

Check whether all exposed bolts, nuts and safety pins are firm and reliable.

Eliminate other faults in the shift.

Check the oil leakage everywhere and deal with it as appropriate.

Check the oil level of transmission, transfer case and hydraulic system oil tank.

Add lubricating oil or grease according to the lubrication requirements.

Wipe the external surface of the well drilling rig equipment, and pay attention to the cleanness and good lubrication of the surface of the well drilling rig base, slide-way, vertical shaft and so on.




Buy Borehole Drilling Machine 200 Meters Depth Small Portable Lightweight Drilling Machine at wholesale prices
Send your message to this supplier
 
*From:
*To: Jinzhou City Shitan Machinery Equipment CO. LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0