| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Wall Panel Roll Forming Machine |
|---|---|
| Brand Name: | FMS |
| Certification: | CE,ISO |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | Negotiable |
| Payment Terms: | T/T, Western Union |
| Supply Ability: | 30 sets per month |
| Delivery Time: | 30days |
| Packaging Details: | Main machine is nude,the computer control box is packed by plastic. |
| Product name: | Corrugated Roofing Sheet Iron Wall Panel Roll Forming Machine Manufacturer |
| Suitable to process: | Color steel plate |
| Dimension: | 7500X1500X1910mm |
| Cutting System: | Hydraulic Cut |
| Weight: | 6.5t |
| Material of Roller: | High Grade 45# Forged Steel Plated with Hard Chrom |
| Voltage: | 380V 3phase 50Hz |
| Material of Cutting: | Cr12 Mould Steel with Quenched Treatment |
| Hydraulic: | 40# |
| Company Info. |
| Cangzhou Famous International Trading Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Machine consisit of uncoiler and its base, coil sheet guilding equipment, roll forming system, cutting system, hydraulic station, controling system and supporter table.
Equipment Detailed Parameters:
No. | Corrugated Roofing Sheet Iron Wall Panel Roll Forming Machine
Manufacturer | |
1 | Suitable material | Color steel sheet ,galvanized steel sheet, aluminium sheet |
2 | Width of material | 1000mm or as customer's requirements |
3 | Thickness of material | 0.3-0.8mm or as your needs |
4 | Working speed | 0-15m/min |
5 | Electrical control system | PLC control system |
6 | Shaft diameter | 80mm/85mm/90mm |
7 | Dimension | 7500x1500x1920mm |
8 | Weight | About 8 Tons |
9 | Voltage | 380V 3phase 50Hz or as the customer's requirements |
10 | Material of roller | High grade 45# forged steel plated with hard chrome plating |
11 | Material of cutting | Cr12 mould steel with quenched treatment |
12 | Working time | Can be 24 hours |
13 | Workers | 1-2 only |
Guarantee
1. Guaranteed against malfunctions due to manufacturing defects for1 years after date of purchase except Electrical parts.
2. Repairs will not be performed even during the guarantee period in the follow circumstances
- Damage occurs due to a natural disaster
- Malfunction occurs due to user error
- Malfunction occurs due to modifications
- Malfunction occurs due to further movement or shipment after installation
Payment terms
40% in advance as down payment
60% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.

|