| Sign In | Join Free | My benadorassociates.com |
|
| Categories | LCD Screen Module |
|---|---|
| Brand Name: | QIHANG |
| Model Number: | JXL-19264-1D |
| Certification: | CE ROHS |
| Place of Origin: | China |
| MOQ: | 100 |
| Price: | 0.1 |
| Payment Terms: | L/C, T/T, Western Union, MoneyGram |
| Supply Ability: | 100,000piece/ month |
| Delivery Time: | 7-15DAYS |
| Packaging Details: | blister packing within carton |
| Product Name: | TFT LCD Display Modules |
| LCD IC Connection: | COB COG |
| Display Code: | Segment Code or Points |
| BG: | yellow/green/blue |
| Customize: | support |
| MOQ: | 1piece |
| Cert: | CE ROHS |
| Origin: | shenzhen, china |
| Company Info. |
| Shenzhen Qihang Electronic Technology Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Segment Graphic TFT Controller Board TFT LCD Screen Display Modules
| Name | Segment Graphic TFT Controller Board TFT LCD Screen Display Modules |
| Display Mode | FSTN/Black-White/Transflective/Positive |
| Viewing Angle | 12 0‘clock |
| Drive Method | 1/65 Duty,1/9 Bias |
| Top | -20℃~+70℃ |
| Tsp | -30℃~+80℃ |
| Connector | COG+FPC |
| Drive IC | ST7565R |



FT Intelligent Controller Board Amoled Flexible TFT LCD Display Modules
Workshop



F A Q:
Q: Can you customize the product? what do you need?
A:The product can be customized, but TFT lcd module has different tooling cost, which includes FPC, Touch Screen, Backlight , Bezel and so on.
Q: Can you provide drawings and related procedures?
A: We can provide drawings and procedures for customers to confirm.
Q: Can the LCD module be Export directly?
A: We have passed ISO9001, SGS, TUV, BV, RoHS and other certifications, and can export.
Q: How do you manage product quality?
A: The products are baked, aging, electrical measurement and other procedures for testing.
Q: How long is the product warranty and service?
A: The product is valid for 1 year and is a lifetime technical support service.
Q: Is the product in stock? How long production cycle?
A: Some products are in stock, Small batch production for 1weeks,Mass production for 2 weeks.
|