| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Heat Exchanger Tubes |
|---|---|
| Brand Name: | TORICH |
| Model Number: | SA179 |
| Certification: | CE,ISO |
| Place of Origin: | ZheJiang,CHINA |
| MOQ: | 1Tons |
| Price: | negotiable |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 5000tons per month |
| Delivery Time: | 30-45 days |
| Packaging Details: | woven bag or wooden box |
| Product Name: | SA179 Seamless Carbon Steel Boiler Tubes |
| Keyword: | SA179 Boiler Tubes |
| Steel grade: | SA179,1010,1020 |
| Application: | Boiler and heat exchanger |
| Type: | Cold-drawn |
| Whether alloy: | Non-Alloy |
| WT: | 0.5-50mm |
| OD: | 3.2-76.2mm |
| Company Info. |
| TORICH INTERNATIONAL LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |
SA179 BGW14 Carbon Seamless Boiler Tubes
Torich International Limited is a professional manufacturer and exporter of steel pipes materials.
It is an international marketing and sales company specialized in steel tubes, which holds the factories of Carbon Steel Boilers Tubes
Applications:
for Boilers, Superheaters,
Heat-Exchangers,
High-pressure Boilers,
Steam Boilers
Cold Condensers and High-Pressure Services,
High-Temperature Services for Boiler Constructions
Heat Treatment:
Tubes are heat treated after the final cold draw pass at a
temperature of 1200℉(650℃) or higher
Surface Finish:
Finish Tubes are free of scale.
We have normal heat treatment annealing with black surface.
Have bright annealing with grey and bright surface.
Mechanical Testing:
Flattening Test
Flaring Test
Flange Test
Hardness Test
Chemical Composition
| Material | C | Mn | P | S |
| A179 | 0.06-0.18 | 0.27-0.63 | 0.035max | 0.035max |
Mechanical Property
| Material | Tensile Strength,Mpa | Yield Strength,Mpa | Elongation/% |
| A179 | Min 415 | Min 205 | Max 20 |
Good concentricityCharacteristic:
Good OD and ID tolerance
High Precision
Stable Quality
TORICH QUALITY ASSURANCE
Product Show for SA179 Boiler Tubes


production process for SA179 Boiler Tubes








FAQ:
A: manufacturer,also can do trading.
A: Generally speaking,it is 10-15 days if the goods are in stock,or it is 30-45 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but need pay the cost of freight.
A: Payment<=2000USD, 100% in advance. Payment>=2000USD, 30%
T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact with me.
|