Sign In | Join Free | My benadorassociates.com |
|
Categories | LED Tube Light Bulbs |
---|---|
Brand Name: | AINA lighting |
Model Number: | AN-EDG-IN-T8-22/3 |
Certification: | CE,RoHS |
Place of Origin: | CHINA |
MOQ: | 10000 |
Payment Terms: | L/C, T/T, Western Union, MoneyGram |
Delivery Time: | Samples need 3-5 days |
Packaging Details: | Carton |
Light source: | LED |
Input voltage(v): | AC85-265V |
Cri (ra>): | 80 |
Working lifetime(hour): | 50000 |
Lamp body material: | Aluminum,PC |
Lamp luminous flux(lm): | 110 |
Type: | Emergency light |
Led light source: | SMD2835 |
Base type: | G4 |
Working temperature(℃): | -20 - 50 |
Lamp luminous efficiency(lm/w): | 100 |
Color temperature(cct): | Pure White |
Application: | Indoor Lighting,Residential,WAREHOUSE,Garden |
Material: | Aluminum+PC Cover |
Color: | Pure White |
Beam angle: | 120 degree |
Warranty | 2 Years | Lamp Body Material | Aluminum |
Input Voltage | AC85-265V | IP Rating | IP20 |
Lamp Luminous Efficiency | 100 | Certification | CE,RoHS |
CRI(Ra>) | 80 | Port of Delivery | ShenZhen, ShangHai |
Working Temperature | -40-50 | Application | Residential |
Working Lifetime(Hours) | 45000 | Light Source | LED |
A. Chips of the LED tube have good wire & copper bracket inside with great heat dissipation
B.More high-quality driver are available
C.High quality PC cover>90% light transmittance well-distributor of light
D.24H strict test before packing
1. High-Quality SMD 2835 Chips of Optional Light Efficacy & CCT
2. Single or Double End Input, No Light Flickering IC Driver
3. High Transmission Clear / Frosted PC Cover Fitted in Aerospace Aluminum Body
4. High-Quality G13 / FA8 PC Caps
5. Lifetime of 30,000 Hrs. With 2 Years Warranty
Installation
1. Living room, bedroom, kitchen, washroom;
2. School, university, hospital, hotel;
3. Conference, meeting room, show room, showcase;
4. Commercial complexes;
5. Factory, plant, warehouse, office, production line;
6. Supermarket, department store;
7. Subway station, bus, train and so on.
1. If 72h aging test with automatic switching before each shipment.
2. 100% vibratility test will make sure the fastness of the assembling.
3. 100% resist voltage test of AC85-305v makes sure those tubes compatible for both 120v and 277v.
4. More than 95% lumen maintenance based on the 6000h LM-80-08 test
5. -40°C to 50°C (-40°F to 122°F) extreme environment compliant.
1. By express: Such as DHL, UPS, TNT, FEDEX etc. The dispatch time is about 3-7 working days.
2. We will search for an economical shipping company to transport the goods safely.
3. Air Freight: When you order more than 100kg which will be more economical than express.
4. Agent designated by client: Please tell us the contact details of your shipping agent/forwarder
1. Payment: T/T, 30% deposits before production, 70% balance to be paid before delivery.
2. Production lead time for 100~500pcs: 7days, 500~1000pcs:10days
3. Sample can be delivered in 3 days
4. Shipping port: ZHONGSHAN/SHENZHEN
5. Discounts are offered based on order quantities
![]() |