| Sign In | Join Free | My benadorassociates.com |
|
| Categories | CNC Stainless Steel Parts |
|---|---|
| Brand Name: | 7 Swords |
| Model Number: | OEM |
| Certification: | ISO9001:2015, ISO13485:2016 |
| Place of Origin: | Guangdong, China |
| MOQ: | 1PC |
| Price: | Negotiable |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 10000Pcs/ Month |
| Delivery Time: | 7-15 work days |
| Packaging Details: | As the requirement of customer |
| keyword: | CNC Turning Parts |
| Type: | Turn-mill Compound Parts |
| Process: | Cnc Turning |
| Our Service: | 24 hours Online |
| Lead time: | 7-15 days |
| Company Info. |
| Shenzhen Perfect Precision Product Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Precision Bending Accessories, Laser Cutting Parts, Black Box
Quick details:
1. Keyword: Sheet Metal Parts
2. Process: Sheet Metal Fabrication
3. Color: Any
4. Place of Origin: Guangdong, China
5. Application: Any
6. Drawing Format: 2D/(PDF/CAD)3D(IGES/STEP)
7. Lead time: 1-2 weeks

Specification of CNC Machining Parts
| Product | CNC machining parts |
| Material | Aaluminum,Stainless Steel or OEM |
| Size | Customized according to your drawing |
| Samples | sample available |
| Tolerance | +/-0.01mm to +/-0.005mm |
| Logo | custom logo available |
| Surface treatment | *Polishing*Laser engraving*Sand blasting |
| Color | Customized |
| Services | OEM & ODM & Design & Assemble Services |
| Quality System | ISO9001:2015 |

FAQ
1. Where is your factory?
We are located in Shenzhen, China.
2.What do you need to provide a quote?
Please kindly send us the drawings or samples of your product. Details below should be included:Drawings/Quantity/Material/Other Requirements
3.How about the packing?
Standard or customized will both be available.
4.Will my drawings be divulged if you benefit?
No, we pay much attention to protect our customers’ privacy of
drawings, signing NDA is also accepted if need.
5.What about the leading time for mass production?
Frankly, it depends on the order quantity,and it is common about 7 days to 15 days after your deposit if no tooling needed.
|