| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Roll Forming Equipment |
|---|---|
| Brand Name: | SUSSMAN |
| Model Number: | SS-FP |
| Certification: | CE, SGS, ISO9001 |
| Place of Origin: | China |
| MOQ: | 1 set |
| Price: | negotiable |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 10 sets per month |
| Delivery Time: | 60-90 working days after payment |
| Packaging Details: | Standard package with film, plastic and steel wire. (or customized) |
| Type: | Fence Post Roll Forming Machine |
| Thickness: | 0.5-0.7mm galvanized, G235-350Mpa |
| Rolling Speed: | About 10-20 m/min |
| Roller Stations: | About 21 stations |
| Company Info. |
| Sussman Machinery(Wuxi) Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
0.5mm-0.7mm Thickness Fence Post Roll Forming Machine
The fence system includes fence post, fence rail track and fence panel. It needs 3 sets of roll forming machines.
Technical Data
| Items | Specifications | |
| Material of coil | Material Thickness | 0.5-0.7mm galvanized, G235-350Mpa |
| Un Coiler | 3 tons manual | |
| Forming system | Rolling Speed | About 10-20 m/min |
| Roller Stations | About 21 stations | |
| Roller Material | 45# Steel with quenching 60mm shaft | |
| Maim Motor Power | 7.5 kw | |
| Hydraulic cutting Power | 3 kw | |
Cutting system | Material Of Cutting | CR12 with quench treatment |
| Hardness | HRC58-62 | |
| Tolerance | +-1.5mm | |
| Electrical control system | Electric Source | 380V, 50HZ,3 phase Also can satisfy Customer’s require |
| Control System | PLC with touch screen | |
| Weight | About 3.5 tons | |
| Way Of Drive | 1 inch single chain |
Machine List:
| 3 ton manual de-coiler | 1 set |
| Feeding with guide | 1 set |
| Main roll forming machine | 1 set |
| Hydraulic cutting device | 1 set |
| PLC Control box | 1 set |
| Hydraulic station | 1 set |
| 4m out table | 1 set |
| Safety cover | 1 set |
Profile Drawing:

Application:



After-sale Serive
- The seller take responsibility to installation and commissioning
of the equipment and free training. After machine arrive the
destination, by the request of the buyer , the seller will provide
1 technical engineer to guide installation and training , and the
buyer should give the technical person with full cooperated.
- Installation period: about 5 days after the complete preparation
by the buyer such as the foundation and all necessary accessories.
- Training time: 5 days.
- Before departure of the engineers from seller, the buyer should
pay for installation and commissioning fee 100$/day to the point
account of the seller. The two-way ticket,visa, food, hotel , the
translator and insurance are all should provide by buyer with full
responsibility.
-The seller supply technical data (including forming mould drawing,
electrical elements drawing and equipment drawing etc.)
|