Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Machinery Engines & Parts >

Heavy Duty Rocker Arm Assembly MAN Engine D08 Steel Forged 11-13L OE 51.04202-0165

Categories Rocker Arm Assembly
Brand Name: Jinlong
Certification: IAFT16949
Place of Origin: Zhejiang,China
MOQ: 50
Price: $50-$100 for one pices
Payment Terms: L/C, T/T
Supply Ability: 5000 set/month
Delivery Time: 20-30 days
Packaging Details: carton
Material: Steel
OEM:: 51.04202-0165 51.04203-5064 51.04200-6022 51.04200-6023
OE Replacement: OE standard quality
Feature: Steel Forged
Application: Trucks, Heavy Duty Vehicle
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Heavy Duty Rocker Arm Assembly MAN Engine D08 Steel Forged 11-13L OE 51.04202-0165

Heavy Duty Rocker Arm Assembly MAN Engine D08 Steel Forged 11-13L OE 51.04202-0165


OE Replacement : Meets OE standard quality and performance requirements. Utilizes the latest in design and material technology Produced under strictly observed quality under international standards Advanced manufacturing technology ensures durability and optimum operation simple installation and long life as a guarantee.


Compatible Vehicle:

MAN Engine:D08 Displacement:5-7L


OE No.:51.04202-0165 51.04203-5064 51.04200-6022 51.04200-6023


Material:Steel
OE Replacement:OE Standard Quality
Feature:Steel Forged
OEM::51.04202-0165 51.04203-5064 51.04200-6022 51.04200-6023
Certification:IAFT16949
Application:Trucks, Heavy Duty Vehicle


FAQ
Q1. What's quality of the goods you can provide?

A: Genuine parts from the original factory directly; OEM parts from the OEM factory, and aftermarket with high quality from reliable factory.

Q2. Can you accept sample orders?

A: Yes, our MOQ can be 1PC(SET).


Q3.What's your packing?

A: We usually pack our goods in cartons with our own brand attched or in neutral white boxes and brown cartons. Customized brand packing boxes(cartons) are acceptable upon your requirements.


Q4. How long is the delivery time?

A: Generally, we have stocks for most engine parts. And it will take 15 to 30 days for some engine assembly and parts. The specific delivery time depends on the items and the quantity of your order.


Q5. What’s your guarantee policy?

A: We provide 18 months’ warranty for our products, 6 months longer than the original manufacturer.

Buy Heavy Duty Rocker Arm Assembly MAN Engine D08 Steel Forged 11-13L OE 51.04202-0165 at wholesale prices
Send your message to this supplier
 
*From:
*To: Yuhuan Jinlong Machinery Co.,Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0