| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Steel Valve |
|---|---|
| Brand Name: | GNEE |
| Model Number: | Z41T-16 |
| Certification: | ISO 9001 |
| Place of Origin: | Henan |
| MOQ: | 5 sets |
| Price: | Negotiable |
| Payment Terms: | L/C, D/A, D/P, T/T, Western Union, MoneyGram |
| Supply Ability: | 8000 set/sets per month |
| Delivery Time: | 5-8 work days |
| Packaging Details: | Standard Sea-worthy Packing |
| Power: | Manual |
| Media: | Water-Oil-steam |
| Structure: | Gate |
| Usage: | Control Water Flow |
| Temperature of Media: | Low Temperature, Normal Temperature |
| Company Info. |
| Gnee Steel (tianjin) Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Jis Marine Cast Iron Gate Valve F7363 5k 65a Cast Iron Wedge Gate Valve
For the valve body, valve cover failure common failures can also take the following repair methods: valve body and valve cover breakage, grit, corrosion aging failure, according to scientific plugging methods to plug the leak; according to the actual situation to repair or replace broken parts or replace the valve.
Nominal Diameter | DN40-DN600 | Valve Body | Cast Iron |
Nominal Pressure | PN10/PN16 | Valve Disc | Cast Iron or Ductile Iron or Stainless Steel |
Operation Temperature | -40°C~225°C | ||
Flange Standard | GOST12820-80 | Seal Material | BRASS |
Suface Treatment | Natural color | Seal Material | BRASS |
Application | Portable water, water distribution service & feed lines, sewage
disposol, irrigation, fire protection pipe systerm, etc. | valve stem Stainless Steel/carbon steel | |
FAQ:
1.Q: How long will you give me the reply?
A:we will contact you in 6 hours as soon as we can.
Q: Are you trading company or manufacturer ?
A: We are factory
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to
quantity.
4Q.What are your quality control procedures?
A: We adhere to strict quality control procedures that begin with product design and carry through to the end of the production
process using state-of -the-art quality control equipment.

|