| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Laminate Floor Underlay |
|---|---|
| Brand Name: | No brand |
| Model Number: | EPE 30-G |
| Certification: | SGS |
| Place of Origin: | China |
| MOQ: | 1000 sqm |
| Price: | Negotiable |
| Payment Terms: | T/T |
| Supply Ability: | 1 million sqm per week |
| Delivery Time: | 12WORKING DAYS |
| Packaging Details: | Shrink wrapped |
| Material: | Polyethylene foam |
| Thickness: | 3mm thickness |
| Size: | 200 sqft |
| Color: | black |
| Density: | 20kg/m3 |
| Feature: | Durable |
| Coating: | silver foil |
| Application: | Laminate flooring |
3mm EPE Foam With Gold Film For Laminate Flooring With Silver Foil For Noise Reduction
Introduction:
EPE is a basic type of flooring underlay, it is an important
moisture barrier and cushioning, it is also a very important
ingredient in producing a floor with a quality sound. With foil
backing will increase the property of thermal plus.
Suitable area:
Laminate floor, wood floor, engineered floor, hardwood floor,
floating floor, sub-floors, etc.

| Roll Cover: | 18.6m2 |
| Roll Width: | 1100mm |
| Roll Overlap | 100mm |
| Thickness | 3mm |
| Moisture Resistance Foil | Goldend film |
| Material: | Polyethylene |
| Antimicrobial: | No |
| Moisture Resistant | Yes |
| Cushioning: | Yes |
| Commercial / Residential: | Residential |
How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free
of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to
keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section
using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping
film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is
flush up against the other piece of underlayment and on top of the
overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.
|