| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Vapor Barrier Film |
|---|---|
| Brand Name: | No Brand |
| Model Number: | PE-6 |
| Certification: | SGS |
| Place of Origin: | China |
| MOQ: | 1000 sqm |
| Price: | Negotiable |
| Payment Terms: | T/T |
| Supply Ability: | 1 million sqm per week |
| Delivery Time: | 12WORKING DAYS |
| Packaging Details: | packed with shrink wrapped |
| Name: | 6 Mil Black Polyethylene Film Vapor Barrier Underlayment |
| Material: | LDPE |
| Thickness: | 0.06 mil |
| Color: | BLACK |
| Size: | 500 sqft/roll |
| Roll width: | 1.1m |
| Application: | subflooring |
| Function: | Waterproofing membrane |
6 Mil Black Polyethylene Film Vapor Barrier Underlayment For Moisture Proofing
Introduction:
| Description | PE flim | |||||
| Color | Black | |||||
| Covering size | 500 sqft/roll | |||||
| Thickness | 0.15 mm | |||||
| Application | subfloor | |||||



How to Install
Step 1: Clean Your Subfloor
Clean your subfloor using your broom and dustpan so that it is free
of any foreign objects.
Step 2: Roll Out Your Underlayment
Roll your underlayment next to the wall. Start in the corner to
keep it as even as possible across the room.
Step 3: Cut the Section
Once you have your underlayment firmly in place, cut the section
using your scissors or utility knife.
Step 4: Roll Out the Next Section
Roll out the next section with the tape side over the overlapping
film on the previous section.
Step 5: Butt Underlayment
Butt your underlayment sections together so that the tape side is
flush up against the other piece of underlayment and on top of the
overlapping film.
Step 6: Cut Section
Cut the next section of underlayment.
|