Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Construction Machinery Parts >

D7E S200G mini turbocharger 12709880018 CH1946

Categories ENGINE TURBO CHARGER
Brand Name: HDPARTS
Model Number: D7E S200G
Place of Origin: China
MOQ: 1 pc
Price: Looking forward to your inquiry
Payment Terms: T/T, Western Union, MoneyGram,HSBC
Supply Ability: 1000 Piece/Pieces per Month
Delivery Time: 2-5 work days
Packaging Details: Plastic bag , Box , Carton
After Warran: Online support
OEM Service: Available
Packing: Plastic bag , Box , Carton
Application: Construction / Industry / Agriculture / Genset / Marine / Handling
Engine Type:: Diesel
Marketing Type:: Hot Product
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

D7E S200G mini turbocharger 12709880018 CH1946

D7E S200G mini turbocharger 12709880018 CH1946

Specification

Applicable modelsD7E S200G
TypeEngine turbocharger
Original number12709880018
Warranty6 months
Engine TypeDiesel
Brand NameHDPARTS
ConditionNew
SizeOEM Size

matters needing attention

Don't leave without a car

After the engine is started, especially in winter, it should be idled for a period of time so that the lubricating oil can fully lubricate the bearing before the supercharger rotor runs at high speed. Therefore, do not slam the accelerator immediately after startup to avoid damaging the oil seal of the supercharger.

Maintenance error

Myth 2: turn off the engine when you arrive at your destination

After the engine runs at high load for a long time, the owner must run at idle speed for several minutes before turning off the engine, so that the parts can be effectively cooled and lubricated. The behavior of turning off the engine immediately will cause the vehicle to be in a high-speed idling state. The same problem as sudden acceleration will damage the bearing of the vehicle.


Product Description

Company Information


Guangzhou Star Mustang Construction Machinery Parts Co., Ltd. is a construction machinery engine parts company integrating research and development, agency, domestic and international sales and e-commerce.


At presentIt was the first one to enter the construction machinery parts market in 1995. It is located in the center of the world's largest industrial distribution center.​


is supported by scientific research and development strength, new business philosophy, mature marketing team, development and sales of high quality excavator parts.


covers a wide range, and its products are characterized by high strength, high toughness, high temperature resistance, no deformation, high wear resistance, etc.


Including Hydraulics parts, Final Drives parts, Undercarriage parts, General consumable parts, Engine spare parts, and stuff like that which are high-qualified products.


The product matching different kinds of excavator spare parts, which caters to the current market demand for high.


RODUCT CATEGORIES

1570502302971052897


Packaging & Shipping


Packaging material:Plastic, carton, wooden box


We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)


Packaging & Shipping

FAQ

Q: What is your main products?
A:We mainly sell diesel engine parts, such as piston, piston ring, cylinder liner, crankshaft.

Q: Do you have any other products?
A:Yes, we have many other diesel engine spare parts.

Q: How to place orders?
A :The order is from your inqiuries.

  1. Confrim PI (the engine model, price, quantity, packing, delivery time, shipping way, time of payment).

  2. You make payment and send us receipt of payment.

  3. We get to start preparing the goods when we receive payment from you. (The goods will be sent between 48 hours to 72 hours if we have in stock. The goods will be sent before the delivery time and the sample will send to you for checking.)

  4. We would deliver goods after we get balance from you. The order finish when you get goods and feel satisfied.

Q: What is the MOQ?
A:We provide sample and will arrange goods as your requirements.

Q: How to make payment?
A:After you confirm PI, you can pay thruogh Alibaba Trade Assurance,Wire transfer, Western union, Paypal, Cash. (The production order can be pay 30% deposit first, after we arranged well, then you pay the balance.)

Q: Could you give guarantee ?
A:Yes, one year warranty.

Q: What kind of packing you can provide?
A:We can provide packing as your requirements or neutral packing or our own trademark packing.


Buy D7E S200G mini turbocharger 12709880018 CH1946  at wholesale prices
Send your message to this supplier
 
*From:
*To: Guangzhou Star Mustang Construction Machinery Parts Co., Ltd
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0