| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Multi Storey Steel Building |
|---|---|
| Place of Origin: | Qingdao, China |
| Brand Name: | XGZ |
| Certification: | ISO,CE,SGS,TUV,LETTER OF PATENT ETC. |
| MOQ: | 1000sqm |
| Price: | USD15-75/SQM |
| Packaging Details: | 20ft/40GP/40HQ/40 OT etc. |
| Delivery Time: | 20 - 60 days |
| Payment Terms: | TT, LC |
| Supply Ability: | 50,000 ton/year |
| Steel Grade: | Q355, S355JR |
| Name: | Steel Structure Building |
| Product Name: | Multi Storey Steel Building |
| Main Steel: | Q355, Q345, Q235, Q345B, Q235B Etc. |
| Panel: | Sandwich Panel |
| Door: | Rolled Up Door |
| Surface Treatment: | Hot Dip Galvanized Or Painted |
| Advantage: | Aluminum Frame |
Famous Steel Structure
Project name: Qingdao Jiaodong International Airport
Project address: Qingdao, China
Project Brief Description: Jiaodong International Airport (Comprehensive Transportation Center and Parking Building) project adopts open-cut construction method. The buried depth of the structure is about 2.5m, the wrapping surface of the wall is about 3.5m*0.85m. Each steel tube column is made of 25mm or 16mm thick steel plate coil. And it is 30 meters high and weighs about 20 tons. It is transported to the construction site in sections of 17m+13m. The total amount of steel used in the project is about 1, 500 tons. As a newly built airport in Qingdao in recent years, Jiaodong Airport covers an area of 540, 000 square meters, among which the steel structure of the comprehensive traffic center and parking building is built by Xinguangzheng Group, our company. As the only local large international airport in Qingdao, our company is honored to undertake the project as the first choice of steel structure builders with strength, If you also recognize our strength, welcome to inquire with us and we will conquer your trust with strength.
| Specifications: | |
| Main Steel Frame | H Section Steel Beam And Columns, Painted Or Galvanized, Galvanized C Section Or Steel Pipe |
| Secondary Frame | Hot Dip Galvanized C Purline, Steel Bracing, Tie Bar, Knee Brace , Edge Cover Etc. |
| Roof Panel | EPS Sandwich Panel, Glass Fiber Sandwich Panel, Rock Wool Sandwich Panel, And PU Sandwich Panel Or Steel Sheet |
| Wall Panel | Sandwich Panel Or Corrugated Steel Sheet |
| Tie Rod | Circular Steel Tube |
| Brace | Round Bar |
| Knee Brace | Angle Steel |
| Roof Gutter | Color Steel Sheet |
| Drawings & Quotation: | |
| (1) Customized Design Is Welcomed. | |
| (2) In Order To Give You An Exactly Quotation And Drawings, Please Let Us Know The Length, Width, Eave Height And Local Weather. We Will Quote For You Promptly. | |
FAQ:
1. You are manufacture factory or trading company?
We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show you our professionalism. Also you will can get best and most competitive price after visiting us.
2. Can you send engineers or whole team to install my project?
We will supply detailed installation drawings and video for free. Certainly we also can send engineers as installation director or a team upon request.
3. Do you accept container loading inspection?
You are welcomed to send an inspector, not only for the container loading, but any time during the production time.
4. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures (Xsteel) and etc. we can design complex industrial building like office building, super marker, auto dealer shop, shipping mall, hotel, department and so on.
5. What is the delivery time?
Delivery time depends on order quantities. In general the delivery time to nearest seaport in China will be 30-45 days after receiving deposit.
|