| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Stainless Steel Elbow |
|---|---|
| Brand Name: | TOBO |
| Model Number: | Elbow |
| Certification: | SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED |
| Place of Origin: | China |
| MOQ: | 1pcs |
| Price: | $1.10/Piece |
| Payment Terms: | L/C, T/T, Western Union |
| Supply Ability: | 3,0000 pcs per month |
| Delivery Time: | 25 days |
| Packaging Details: | STANDARD PLY-WOODEN CASE OR AS YOUR REQUEST |
| Material: | Carbon Steel |
| Standard: | ASTM,ANSI / ASME |
| Item Shape: | 90 degree elbow |
| Keyword: | 90 degree elbow bend pipe |
| Process: | Forging+machining+heating Treatment |
| Surface treatment: | Mirror Polished |
| Connection: | Welding |
| Usage: | Oil Gas Water Industrial |
| Packing: | plywood case or pallet |
| Company Info. |
| TOBO STEEL GROUP CHINA |
| Verified Supplier |
| View Contact Details |
| Product List |
Customized SCH10 Butt-Weld pipe fitting long radius 90 degree elbow bend pipe
| Size | 1/2’’~10’’(Seamless);12’’~72’’(Welded) |
| Thickness | Sch5S~Sch160XXS |
| Material | Carbon Steel,Stainless Steel,Nickel alloy steel |
| Package | Wooden cases, pallets, nylon bags or according to the customers' requirements |
| Delivery time | 10-100 days depending on quantity |
| Payment terms | T/T or Western Union or LC |
| Shipment | FCA Tianjin/Shanghai, CFR, CIF, etc |
| Application | Petroleum/Power/Chemical/Construction/Gas/Metallurgy/Shipbuilding etc |
| Remarks | Other materials and drawings are available. |
Detailed Images:



Packing & shipping:
Package:Standard export carton packing.
Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and
order quantity.
FAQ:
We are manufacturer ,You can see the Alibaba certification.
Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Yes, we could offer the sample for free charge but need pay the cost of freight.
Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.
|