| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Pile Driver Long Boom |
|---|---|
| Brand Name: | VIBRA |
| Model Number: | FV-280 |
| Place of Origin: | SHANGHAI |
| MOQ: | 1 set |
| Price: | Negotiation |
| Payment Terms: | T/T,D/P,Western Union,MoneyGram |
| Supply Ability: | 15 set/month |
| Delivery Time: | 7-35 days |
| Packaging Details: | 5.824 CBM |
| Name: | Vibratory Pile Driving Equipment |
| Feature: | Eco Friendly |
| Extension Arm: | 500KG |
| Operation Pressure: | 32MPA |
| Hammer Weight: | 1900KG |
| Vibration Frequency: | 2800RPM |
| Centrifugal Force: | 335KN |
| Excavator Weight: | 20-30T |
| Company Info. |
| Shanghai Yekun Construction Machinery Co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
Our Medium & Large Excavator-Mounted Hydraulic Vibrating Pile Hammer is a high-performance construction equipment engineered for infrastructure projects. Integrating European and American advanced hydraulic vibration technology and years of industry experience, it features a unique box structure, imported core components, and exceptional reliability, perfectly matching 20-60T excavators to meet diverse heavy-duty construction needs.
| Item | FV-250 | FV-280 | FV-300 | FV-330 | FV-350S | FV-350 | FV-400 |
|---|---|---|---|---|---|---|---|
| Vibration Frequency (rpm) | 2500 | 2800 | 3200 | 3200 | 3200 | 3200 | 3200 |
| Operation Pressure (Mpa) | 30 | 32 | 32 | 32 | 32 | 32 | 32 |
| Centrifugal Force (KN) | 265 | 335 | 350 | 372 | 435 | 455 | 485 |
| Max. Pile Length (m) | 10 | 12 | 12 | 12 | 15 | 15 | 18 |
| Arm Weight (kg) | 500 | 500 | 670 | 670 | 670 | 750 | 750 |
| Hammer Weight (kg) | 1700 | 1900 | 2100 | 2300 | 2400 | 2600 | 2700 |
| Matching Excavator (T) | 20-30 | 20-30 | 30-35 | 33-40 | 35-40 | 40-45 | 45-60 |
Founded in 2014, Shanghai Yekun Machinery Co., Ltd. is a professional manufacturer, supplier, and service provider specializing in hydraulic vibrating pile hammers and their components. Our product range covers mini, medium, and large-sized models, widely applied in global infrastructure and construction industries.
We prioritize quality through cutting-edge industrial technology, international technical cooperation, and imported core components. Our young, passionate team adheres to "Client Priority, Quality First, Management as Foundation," striving to become the world’s leading comprehensive pile hammer solution provider. We welcome dealer partnerships and strategic cooperation with ambitious global partners.
A1: 12 months from the date of installation completion, covering the mainframe and key components (excluding wearing parts).
A2: One set is acceptable, supporting flexible procurement needs.
A3: We support T/T and D/P payment terms for global business convenience.
A4: Generally 7-35 days for delivery to Shanghai Port; overseas shipping time is additional based on the destination.
A5: Yes, logo customization is available to meet your branding requirements.
A6: Our equipment is strictly manufactured in accordance with the "Technical Conditions for Pile Driver Enterprises" standards, with imported first-line brand core components.
A7: We warmly welcome dealer partnerships and look forward to developing regional general agent and strategic cooperative relationships with global partners.
|