Sign In | Join Free | My benadorassociates.com |
|
Categories | Lightning Surge Arrester |
---|---|
Place of Origin: | XI'AN CHINA |
Price: | Negotiable |
Payment Terms: | L/C, T/T, D/P, T/T, Western Union, MoneyGram |
Brand Name: | HERONG ELECTRIC |
Certification: | ISO9001 |
Delivery Time: | 30 work days |
Packaging Details: | WOODEN BOX |
Rated voltage: | 0.22kV~330kV |
Company Info. |
herong electric |
Verified Supplier |
View Contact Details |
Product List |
The composite sheathed metal oxide arrester is a comprehensive
scientific research result combining the technical advantages of
organic insulating materials and porcelain sheathed arresters. It
not only has the advantages of porcelain sheathed arresters, but
also has good electrical insulation performance, high dielectric
strength, anti-leakage tracking, and high resistance. Low
temperature, wind and sand resistance, aging resistance,
explosion-proof, good chemical stability, water repellency and
other advantages. The outer jacket is made of high-quality silicone
rubber, and is formed at one time by the integral molding and
vulcanization process, with good sealing performance and long
product life. The products are designed and manufactured in strict
accordance with GB 11032 and other standards, and are at the
leading level of similar products in China. Products are widely
used in major projects of the State Grid and Southern Power Grid,
such as: National Grid 1000kV Jindongnan-Nanyang-Jingmen UHV AC
Test Demonstration Project Jindongnan 1000kV UHV Substation, State
Grid 1000kV Jindongnan-Nanyang-Jingmen UHV AC Test Demonstration
Project Nanyang 1000kV switch station expansion, State Grid ±800kV
Hami-Zhengzhou UHV DC Transmission Project Hami South Converter
Station, State Grid 750kV Lanzhou East Substation, State Grid 500kV
Beijing Shunyi Substation, State Grid 750kV Gansu Baiyin
Substation, State Grid 750kV Shaanxi Baoji Substation, State Grid
750kV Shazhou Substation, State Grid 750kV Qinghai Qaidam
Substation, 500kV Baoji-Deyang DC Transmission Project, Southern
Power Grid EHV 500kV Hechi Substation DC Ice Melting Project,
Guizhou Power Grid 500kV Anshun Substation DC Major projects such
as ice melting and 330kV Samsung substation in Xi'an High-tech Zone
have reliable protection and stable operation.