| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Wireline Pressure Control Equipment |
|---|---|
| Brand Name: | Ruixin |
| Model Number: | 6B×3-1/16 |
| Certification: | API |
| Place of Origin: | China Baoji |
| MOQ: | 1 |
| Payment Terms: | T/T |
| Supply Ability: | 1 set 2 weeks |
| Delivery Time: | 2-3 weeks |
| Packaging Details: | Wooden Box |
| Name: | Wireline Pressure Control Equipment Alloy Steel Wellhead Flange 2 Inch |
| Size: | 2inch ID 2.5inch ID 3inch ID 4inch ID 5inch ID |
| Material: | Alloy Steel&Nickel Alloy |
| Connection Type: | O&B |
| Function: | allows for only the joint that was broken to be tested, without filling the whole lubricator system |
| Work Pressure: | 3k 5k 10k 15k |
| Service: | Standard&H2S |
| Company Info. |
| Ruixin Energy Equipment |
| Verified Supplier |
| View Contact Details |
| Product List |
Wireline Pressure Control Equipment Alloy Steel Wellhead Flange
I. Overview
The wellhead flange is used to connect the tubing male buckle and
the wellhead, the upper part is connected to the tubing male
buckle, and the lower part is connected to the wellhead.
The wellhead flange is connected by bolts and nuts. When in use,
the gasket is placed between the sealing surfaces. After tightening
the nut, the specific pressure on the gasket surface reaches a
certain value and deforms and fills up the unevenness of the
sealing surface to make the connection tight and leak-proof.
II, pressure test:
Wellhead flanges should be subjected to regular pressure strength
tests, and the test pressure is 1.5 times the working pressure.
1. Install the pressure test connector and connect the pressure
test pipeline;
2. Start the pressure test pump for pressure test: press to the
test pressure, keep the pressure for 15 minutes without leakage,
and fill in the test record card.
III, daily maintenance:
1. The withstand voltage test should be carried out regularly;
2. When not in use temporarily, you should bring the protective
wire for storage.
Welcome to contact us at any time.

|