Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Other Construction Machinery >

5 Transport Vehicles Modular Heavy Mechanized Mechanized Steel Bridge Fast Erection

Categories Mechanized Bridge
Brand Name: Harzone
Place of Origin: China
MOQ: negotiation
Payment Terms: According to detailed order
Delivery Time: negotiation
Packaging Details: According to detailed order
Material: Steel bridge
Feature: Reusable
Capacity: Heavy loading capacity
Structure: Simple
Status: Sefl Fold and Unfold
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

5 Transport Vehicles Modular Heavy Mechanized Mechanized Steel Bridge Fast Erection

5 Transport Vehicles Modular Fast Erection Heavy Mechanized Bridge


China Harzone dedicates itself to the following fields:

Design and manufacturing of military bridges and emergency rescue equipment

Design,manufacturing and installation of various kinds of steel bridges and steel structures

Research and re-fitting of special-purpose vehicles and equipment

Engineering contracting

Import and Export trading business


China Harzone has enjoyed a proud history, it must also create a bridge future.


Description of 5 Transport Vehicles Modular Fast Erection Heavy Mechanized Bridge​:

5 Transport Vehicles Modular Fast Erection Heavy Mechanized Bridgee is a set of equipment mainly used for bridging small and medium rivers, dry gaps and marshland with a length within 75m and a depth within 5.5m to ensure all sorts of tanks, artilleries and vehicles, and personnel to get across.


5 Transport Vehicles Modular Fast Erection Heavy Mechanized Bridge​ consists of five transport vehicles with bridge spans with a length of 15m. The chassis is type XC2300/8×8 15T class cross-country truck, with advanced engine, gearbox and axles etc. The trestles are controlled by hydraulic winch; the outriggers ban be adjusted by automatic control technology, with double class hydraulic cylinders. The bridge is erected with shear style erection, and span stretching at mean time to keep safety and stability in erection.


Specification of 5 Transport Vehicles Modular Fast Erection Heavy Mechanized Bridge:
Total weight30.6t
Folded outline dimension (L*W*H)10890*3150*3660 mm
Tracked load60t
Axle load13t
Roadway width3.8m
Span length15m
Max. bridge length75m
Max. height (from shoes to deck)5.5m
Erection time for a single span12 min
Max. current velocity2m/s
Operator7 operators for a single span


Buy 5 Transport Vehicles Modular Heavy Mechanized Mechanized Steel Bridge Fast Erection at wholesale prices
Send your message to this supplier
 
*From:
*To: CHINA HARZONE INDUSTRY CORP.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0