| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Galvanized Steel Coils |
|---|---|
| Brand Name: | Mittel |
| Model Number: | 65mn |
| Certification: | SGS ISO MTC |
| Place of Origin: | China |
| MOQ: | 100KGS |
| Price: | 0.85 USD/KG |
| Payment Terms: | L/C, T/T |
| Supply Ability: | 80000KGS |
| Delivery Time: | 7 Working Days |
| Packaging Details: | Wooden Pallet BOX |
| Width: | 10-1500mm |
| Grade: | 65mn |
| Technique: | Cold Rolled |
| Standard: | ASTM,GB,AISI,JIS,DIN |
| Surface treatment: | black |
| Thickness: | 0.1-10mm |
| Shape: | sheet or coil |
| Company Info. |
| JIANGSU MITTEL STEEL INDUSTRIAL LIMITED |
| Verified Supplier |
| View Contact Details |
| Product List |
Cold rolled steel strips is one of our main products that is widely used in making band saw blade & other blades to cut paper, weed, etc.
Cold rolled steel strip show:


Part 2. The specification
| Descriptions: | Spring Steel Strips With Hardened and Tempered |
| Standards: | GB,ASTM,AISI,DIN,JIS,BS. |
| Steel Grade: | 65Mn,SAE1075,SK5,SKS51 Etc. |
| Thickness: | 0.20mm -- 2.50mm |
| Width: | 8.0mm -- 280mm |
| Edge treatment: | slit edge,round edge etc. |
| Applications: | To be used in making saw blades,cutting tools,hardware,auto-clutches etc. |
| Steel Strip Suface Treatment: | Bright Annealed,Grey Blue,White Polished,Blue Polished,Yellow Polished |
| Sea-worthy Packing Method: | Step 1#: Each coil is covered by moderate high quality anti-rust oil. |
| Step 2#: Inside of each coil is wrapped by oil paper or plastic film. | |
| Step 3#: Outside of each coil is closely covered by compound paper or sack cloth. | |
| Step 4#: Each coil will be again firmly packed outside by steel strapping or PET strapping. | |
| Step 5#: On/about 500KGS--1000KGS to be packed with one iron pallet or ply-wood pallet. | |
| Special remarks: | For Full 20'GP shipment,it can be loaded with total G.W.no more than 27,000KGS |
| For LCL shipment,we can arrange to deliver them to any seaport in China for consolidation. | |
| Customer's special requirements can be considered if possible. |
Part 3. Production line
Part 4. Applications
Contact us
24 hours feedback, 48 hours solution.
|