| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Galvanized Steel Pipe |
|---|---|
| Place of Origin: | Shandong, China |
| Brand Name: | Yuantai Derun |
| Packaging Details: | PVC bag cloth with cable tie or as required |
| Supply Ability: | 5000 Ton/Tons per Month |
| Price: | $680.00/Tons 1-49 Tons |
| Model Number: | 0.16MM-1.5MM*1250MM OR UNDER |
| Certification: | ISO |
| MOQ: | 1 Ton |
| Payment Terms: | L/C T/T (30% Deposit) |
| Delivery Time: | 7-10days |
| Application: | making pipes |
| Type: | Steel Coil |
| Thickness: | 1.0-2.0mm |
| Standard: | bs |
| Length: | 6m |
| Coating: | Z30-Z40 |
| Technique: | Cold Rolled Based, Cold Rolledor Hot Rolled |
| Tolerance: | ±1% |
| Processing Service: | Welding, Punching, Cutting, Bending, Decoiling |
| Spangle Type: | Regular Spangle |
| Skin Pass: | No |
| Oiled or Non-oiled: | Non-oiled |
| Hardness: | Mid Hard |
| Surface Treatment: | Customized |
| Shape: | Rectangular |
| Zinc Coating: | 20-275g/m2 |
| Material: | ASTM/AISI/SGCC/CGCC/TDC51DZM/TDC52DTS350GD/TS550GD/DX51D+Z Q195-q345 |
| Port: | Qingdao,Tianjin ,Shanghai |
Galvanizing includes coating steel, iron, or aluminum with zinc.Although zinc coating can be applied in a variety of ways, the most common method is hot dipping or soaking the metal completely in the bath of molten zinc, which is made of steel and covered with a layer of zinc metal.
Name | stainless steel square tube for sale |
Supply Capacity | 120 tons/month |
Process Method | cold drawn and cold rolled |
Wall Thickness | 1.5-10mm |
Length | 11.8 meters |
Steel Grade | 200 (Ni : 0.8%), 201B (Ni : 3%), 201H (Ni : 5%) |
301 (Ni : 6%), 304, TP304, TP304L/304L, 321, TP321, 316, TP316L,
316L, 316Ti | |
317, 317L, 309S, 310S(2520), 347, Duplex 2205, Duplex 2207, etc. | |
Standards | ASTM / ASME, GB, DIN, JIS, T14975, etc. |
Specification | O.D: 1/4" - 32" (inch) |
W.T: SCH5S, SCH10S,SCH40S,SCH80S,SCH160S,etc. | |
Or non-regular size to be tailored as required. | |
Application | Construcion/Building /Industry |
Packing | 1.with plastic cap to protect both ends |
2.plastic bag wrapped outside the pipe | |
3.bundles to be covered by polythene & strapped securely . | |
4.if require ,then pack into wooden box. | |
Certificate | ISO 9001:2008 |
Delivery time | 30-60 days depend on Quantity |
Payment Term | T/T, Irrevocable L/C at sight |
Trade Term | FOB , CFR , CIF |




|