| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Socket Fusion Welding Machine |
|---|---|
| Brand Name: | MM-Tech |
| Model Number: | ZRJQ-40 |
| Certification: | CE |
| Place of Origin: | China |
| MOQ: | 100 set |
| Price: | $42-$58 /set |
| Payment Terms: | T/T, Western Union, D/P |
| Supply Ability: | 100 sets / per week |
| Delivery Time: | 5-8 work days |
| Packaging Details: | 440*290*250 mm |
| Product name: | Socket Fusion Welding Machine |
| Welding Size: | 20-25-32-40mm |
| Suit Material: | PP-R/PE/PB etc |
| Dimension: | 440*290*250 |
| Voltage: | 220V/110V |
| Frequency: | 50Hz/60Hz |
| Working Temperature: | 200-279℃ |
| Warranty: | 2 years |
| Power: | 650W |
| Digital Display: | Yes |
| Company Info. |
| Hebei Mingmai Technology Co.,Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
ZRJQ - 40 650W DVS Standard Digital Display Socket Fusion Welder
Socket Fusion Welding Machine Specification:
| Rated voltage: | 110V/220V |
| Rated frequency: | 50Hz/60Hz |
| Rated power: | 650W |
| Working temp: | 200-279℃ |
| Temp. Tolerance: | ≤5℃ |
Warning temp: | 295℃ |
| Welding size: | 20-25-32-40mm |
| Pcs/Ctn: | 2pcs |
| Suit material: | PP-R/PE/PB |
| N.W/G.W: | 1.6kgs/14.6kgs |
| Dimension(mm): | 440*290*250 |
Socket Fusion Welding Machine digital dispaly function instruction:
1. Fusion temperature set: Choose suitable pipe and fitting, set the suitable temperature before fusion.
2. Cutting the pipe: Cutting the necessary pipe length with the plastic pipe cutter.
3. Clearing the pipe: Clearing the fusion surface of pipe with alcohol.
4. Measure fusion depth: Measure the fusion depth according the fusion standard table and mark.
5. Heating: Put the pipe and fitting into the sockets horizontal, heating time refer standard.
6. Connecting and cooling : Connect the heated pipe and fitting exactly and adjustment finish in 5s.
Repair socket fusion welding machine instruction:
1. Clean repair position: Find the repair position and clear the hole surface.
2. Heating: Choose the right repair bar and push the bar and repair hole into the socket.
3. Connection: Insert the heated bar in the hole exactly adjustment finish in 5s and cooling.
4. Cutting the rest bar: Cutting the rest bar materail and keep it, bar can be used times.
CE Certification:

Factory Display:

|