Sign In | Join Free | My benadorassociates.com
benadorassociates.com
Products
Search by Category
Home > Steel Structures >

Cb250 Prefabricated Steel Bailey Suspension Bridge Length 25-87.6m

Categories Bailey Bridge
Brand Name: HARZONE
Model Number: CB100
Place of Origin: CHINA
MOQ: Negotiation
Payment Terms: According to detailed order
Delivery Time: Negotiation
Packaging Details: According to detailed order
name: CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge
brand name: China Harzone
Material: steel bridge
width: 3.7m
length: 35-87.6m
load: HS20-44
  • Haven't found right suppliers
  • Our buyer assistants can help you find the most suitable, 100% reliable suppliers from China.
  • And this service is free of charge.
  • we have buyer assistants who speak English, French, Spanish......and we are ready to help you anytime!
Submit Buying Request
  • Product Details
  • Company Profile

Cb250 Prefabricated Steel Bailey Suspension Bridge Length 25-87.6m

CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge

CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge(also is named compact panel bridge or PSB) are manufactured by China Harzone Industry Corp., Ltd. 60ft bridge are Single-single construction, and the 90ft bridge are Double-Single Reinforced 2 (DSR2) construction according to the request made by the owner. We provide the all the components except the launching tools.


Panel of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge

The panels of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge are monolithic unit welded in the factory and assembled by panel pin on the construction site, and the main structures are assembled according with the request of span and loading.


End system of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge

The bridge end of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge is composed of post end male, post end female, tie beam, bearing and bearing plate.


Launching equipment and tools of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge

The launching equipment and tools of CB250 Steel Bridge Length 25-87.6m Bailey Suspension Bridge are made up of nose, roller, rock roller, joint, bolt and various spanners. The max loading of roller is 25t and the rock roller id 6t. The nose is netlike structure assembled by bridge components (not offered in this project).

The mechanical properties of Q345B

Yield point,σs MPa

Tensile strength

σb MPa

Extend rate

δs,

Work of concussion,Akv, (vertical), J

180obending test

d= dia.

a= thickness(dia.)

thickness(dia.,side length),mm+20℃0℃-20℃-40℃
≤16>16~35>35~50>50~100Not less thanthickness(dia., mm)
Not less than≤15>16~100
345325295275470~6302134d=2ad=3a

Before offering the quotation, we need to know the exact usage condition so that we can propose a proper technical specification. Hereon, pls kindly supply the following information as detailed as possible:

  1. Type of Bridge
  2. Span, Centre to Centre of Bearing of Supports (Bridge Length)
  3. Type of Deck
  4. bridge Width
  5. Sidewalk
  6. Design Loading
  7. Environmental Condition
  8. Life service requirement ( for how many years the bridge is intended for use)
  9. Regarding the form of anti-corrosion, is it paint (what is the color requirement?) or hot-dip galvanizing?
  10. Quotation terms (FOB which port or other)
  11. Better if there are site pictures can be provided.

Please feel free to contact with us if you have any questions.




Buy Cb250 Prefabricated Steel Bailey Suspension Bridge Length 25-87.6m at wholesale prices
Send your message to this supplier
 
*From:
*To: CHINA HARZONE INDUSTRY CORP.,LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)
 
Inquiry Cart 0