| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Alloy Steel Flanges |
|---|---|
| Brand Name: | TOBO/ METAL |
| Model Number: | Flange |
| Certification: | BV/ SGS/ TUV/ ISO |
| Place of Origin: | China |
| MOQ: | 1 PC |
| Price: | Negotiatable |
| Payment Terms: | Western Union, L/C, T/T |
| Supply Ability: | 100000000 Piece/Pieces per Month |
| Delivery Time: | 15workdays |
| Packaging Details: | plywood case or pallet |
| Material: | Nickel Alloy |
| Size: | Customized |
| Product Name: | Flange |
| Connection: | Welding |
| Head Code: | Round |
| Surface: | Paint Spraying |
| Technics: | Casting |
| Company Info. |
| TOBO STEEL GROUP CHINA |
| Verified Supplier |
| View Contact Details |
| Product List |
Nickel Alloy Steel Flange Copper Nickel Alloy UNS C70600 CUNI 9010 2" 300# Flange
| Product name | 3inch 1500# RF Flange Nickel Alloy steel flange Weld neck flange ASME B16.5 |
| Standard | ASME B16.5 |
| Type | WN flange |
| Materials: | Nickel Alloy steel |
| Size | 3" |
| Class | 1500 |
| Brand | TOBO |
| Certificates | API, ISO, SGS, BV, CE, PED, KOC, CCRC, PDO, CH2M HILL and etc. |
| Application | For water, oil and Gas Industrial |
| Quality | High lever |
| Delivery Time | At the earliest ,within the period required by customer./ Generally it is 7-15 days, depending on the quantity you need. |
| Remark | Also can supply IBR fittings and Specialized NACE & HIC Fittings |

1. 20 + years of production experience at your service.
2. The fastest delivery
3. The lowest price
4. Most comprehensive standards and materials for your choice.
5. 100% export.
6. Our products export to Africa, Oceania, mid east, eastern Asia,
Western Europe etc.
Packaging Details: Pallet/Wooden Case or as per your Specification
Delivery Detail: Shipped in 30 days after payment

A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=10000USD, 100% in advance. Payment>=10000USD, 50% T/T in advance ,balance before shippment.
|