| Sign In | Join Free | My benadorassociates.com |
|
| Categories | Double Layer Roll Forming Machine |
|---|---|
| Brand Name: | FMS |
| Model Number: | Double Layer |
| Certification: | ISO CE |
| Place of Origin: | CHINA MAINLAND |
| MOQ: | 1 Set |
| Price: | Negotiable |
| Payment Terms: | L/C, T/T, D/A, D/P |
| Supply Ability: | 20 Sets Per Month |
| Delivery Time: | 30 Working Days |
| Packaging Details: | 20' FLC |
| Product Name: | Double Layer Roll Forming Machine Corrugated Roofing & 5 Rib Roofing |
| Dimension(L*W*H): | 560*150*160m |
| Raw Material: | Galvalume, Galvanized |
| Working Speed: | 8-15 m/min |
| Rolling thinckness: | 0.3-0.8mm |
| Shaft material: | 45# steel |
| Pow supply: | 380v 50hz |
| Profile: | as customer requested |
| Feeding width: | 1220mm |
| main power: | 4kw |
| Company Info. |
| Cangzhou Famous International Trading Co., Ltd |
| Verified Supplier |
| View Contact Details |
| Product List |
Double Layer Roll Forming Machine Corrugated Roofing & 5 Rib Roofing
Specification
1 | Suitable to process | Color steel plate |
2 | Width of the plate | 914mm/1000mm/1200mm/1220mm/1250mm |
3 | Thickness of the plate | 0.3-0.8mm |
4 | De-coiler | Manual one, can load 5 tons raw material |
5 | Rollers for forming | 16 rows |
6 | Diameter of the roller | 80mm |
7 | Rolling material | Carbon Steel 45# |
8 | Main motor power | 5.5kw |
9 | Material of the cutting blade | Cr12 mov |
10 | Hydraulic cutting power | 4kw |
11 | Processing precision | Within 1.00mm |
12 | Control system | Delta PLC control |
13 | Side panel of machine | 16mm |
14 | Main structure of the machine | 350 H steel |
15 | Weight | About 3T |
16 | Dimensions | 5.6*1.2*1.5m |
17 | Voltage | 380V 50Hz 3phases(changeable as needs) |
18 | Certificate | CE/ISO |
19 | Custom | According to customer's requirements |
Advantage
The metal system is accurate and solid, and will not move over time
or with changes in temperature.
There is a wide range of stud widths from 50mm to 146mm to meet
varying requirements.
It is a fast and clean system to erect that allows services to pass
through easily.
All sections fit together easily and door frames are formed very
simply.
Payment terms
30% in advance as down payment
70% is paid before the shipment is processed
Delivery
FOB: Tianjin Xingang Port
The Delivery Time: 30 days after the down payment is received.

|