| Sign In | Join Free | My benadorassociates.com |
|
| Categories | LED Lamp Lens |
|---|---|
| Brand Name: | ChenMu |
| Model Number: | CM-SZ232-A90-200W |
| Certification: | SGS,ROHS |
| Place of Origin: | Zhejiang,China |
| MOQ: | 100PCS |
| Price: | Negotiable |
| Payment Terms: | T/T, Western Union, MoneyGram |
| Supply Ability: | 5000PCS/Per week |
| Delivery Time: | 3-5 working days |
| Packaging Details: | Cartons |
| Material: | PC |
| Color: | Transparent, Clear |
| Product name: | 10w20W30W led lens |
| Transmittance: | >90% |
| Beam angle: | 60° |
| Oem: | Available,YES |
| Company Info. |
| ChenMu Lighting technology co., Ltd. |
| Verified Supplier |
| View Contact Details |
| Product List |
SMD 3030 200 W High Power Cob Led Lens For Hight Bay
Quick detail
| Product Name: | CM-SZ232-A90°-200W | Beam Angle: | 90°Degree |
| Efficiency: | 92% | Material: | PC |
| LED Chips | 2835&3030 | Size: | Ø232*H6.5mm |
| IP Rating: | IP65 | Power: | 200W |
| Application: | High Bay Light,Square lighting; | ||
Description
SMD 3030 200 W High Power Cob Led Lens For Hight Bay
Specifications:
| Product Name: | CM-SZ232-A90°-200W |
| Beam Angle: | 90°Degree |
| Efficiency: | 92% |
| Material: | PC |
| IP Rating: | IP65 |
| Power: | 200W |
| LED Chips | 2835&3030 |
| Size: | Ø232*H6.5mm |
| Application: | High Bay Light,Square lighting; |
| Quatity Guarantee: | If you receive a defective item, please email us a picture of the defective part. We will arrange for a reshipment or refund to you. |
| Main Maket | Europe,South America,North America,Asia ect |
Shipping and Delivery
Trade Terms: | EXW , FOB , CNF , CIF |
| Payment Terms: | T/T , PayPal , Western Union, Moneygram |
| Delivery time: | 2-3 working days for samples order, 5-7 working days for bulk order |
| Shipment Terms | By Sea, By Air, By Express like DHL, Fedex, UPS, TNT, etc |
IES

Drawing


Notices
FAQ
1) Can I have a sample order?
A: Yes, we welcome sample order to test and check quality.
Mixed samples are acceptable.
3) What is the lead time?
A:Sample needs about 3-5 days prepared; mass production time needs 7-10 days normally.
|